Laserfiche WebLink
PAR RESPONSE <br />• <br /> XXI Screening Building <br /> A. Structure Removal <br /> 1. Gut Building. .$45,360.00 <br /> 2. Demolition of Building. .523,520.OU <br /> 3. Disposal of Building. .$18,043.00 <br /> 4. Foundation Demolition .$13,734.00 <br /> 5. Foundation Disposal $226.20 <br /> XXII Rotary Breaker <br /> A. Structure Removal <br /> 1. Gut Building. .$15,552.00 <br /> 2. Demolition of Building. .$20,160.00 <br /> 3. Disposal of Building. .$15,465.70 <br /> 4. Foundation Demolition $7,848.00 <br /> 5. Foundation Disposal $127.60 <br /> XXIII Access Road w~., 6. ~."-,' `~` ' °_"`"' ~° w~x F.,,i~ n... `.''`' <br /> A. Earthwork <br /> 1. Haulage $4,310.69 <br /> 2. Regrading $933.24 <br /> 3. Topsoil Redistribution. $1,011.92 <br /> 4. Revegetation. $192.44 <br /> XXIV Utah Tract <br /> A. Revegetation $127,648.55 <br />Cost Assumptions <br />1. All costs that were applicable came from means site work cost data, <br />1986, 5th edition. <br />~• 2. An asterisk (*) indicates these costs were increased using the <br />average percentage increase from 1981 to 1986 given by tables in <br />the above publication. <br />ixR <br />