Laserfiche WebLink
I. #5 PORTAL AREA <br />Removal of Structures <br />Move training center, main offices ,safety trailer, <br />engineering trailer, womens bathhouse, drafting trailer, <br />and old drafting trailer * $8,556.00 <br />Silo removal <br />Explosive demolition <br />pg. 26 350 - 0100 <br />n = 41,280 cf x .14/cf = $5,780.00 <br />' Concrete removal to #5 portal <br />1,529 cy @ 3000 ft haul <br />pg. 27 430 - 3200 <br />`~~ $15.3/cy /10,560 ft x 3000 ft = $4.35/cy <br />1,529 cy x $4.35/cy = $6,651.15 <br />/ FUEL ISLAND <br />Demolition of Pad <br />30' x 40' = 1,200 sq. ft. <br />pg. 25 250 - 0600 <br />1,200 sq. ft x $3.27/sq.ft. _ $3,924.00 <br />Cutting of Beams <br />Approximately 100 l.f. of beam <br />pg. 29 600 x 00000 <br />1001f x $2.36/lf = $236.00 <br />Disposal of Material <br />Assume 70 cy of concrete (pad and well) <br />pg. 27 430 - 3200 <br />15.30/cy /10,560 ft x 2000 ft = 2.90/cy <br />70 cy x $2.90/cy = $203.00 <br />AWASH DOWN PAD <br />Removal of Footings <br />6 footings <br />6x9' x9' x3' = 1,458cfor54cy <br />From page 25 270 - 1500 <br />(Assume 2' x 3' footers) <br />cost $15.89/lf <br />6 footings x 9 feet x $15.89 = $858.06 <br /> <br />1 <br />