Laserfiche WebLink
. XVII Empire Tract Substation and Borehole <br /> A. Structure Removal <br /> 1. Fence Removal $952.00 <br /> 2. Concrete Pad Removal. $1,308.00 <br /> 3. Disposal of Concrete. $11.06 <br /> 4. Disposal of Red Rock. $2,148.15 <br /> 5. Borehole Removal. $1,091.20 <br /> B. Earthwork <br /> 1. Grading $6,000.00 <br /> 2. Topsoil Redistribution. $673.40 <br /> 3. Revegetation. $577.31 <br /> 4. Grade Substation Road $630.00 <br /> 5. Road into Substation <br />• Topsoil, Revegetation $121.27 <br /> 6. Topsoil Borehole. $756.16 <br /> 7. Revegetate Borehole $128. <br /> XVIII Overland Conveyor <br /> A. Structure Removal <br /> 1. Conveyor Demolition .$49,368.00 <br /> 2. Conveyor Disposal $1,927.80 <br /> 3. Steel Support Demolition. $4,704.48 <br /> 4. Steel Support Disposal. 51,468.80 <br /> 5. Conveyor Footing Demolition $6,250.00 <br /> 6. Conveyor Footing Disposal 58,700.00 <br /> 7. Supports Near Road Cut. $220.00 <br /> <br />~ ~'~, Ge, <br />fly 3~~ <br />vii <br />