Laserfiche WebLink
XI Crusher Site <br /> A. Structure Removal <br /> 1. Retaining Wall Removal. $499.33 <br /> B. Earthwork <br /> 1. Fill Redistribution $408.13 <br /> 2. Ripping $926.63 <br /> 3. Grading $408.13 <br /> 4. Topsail Redistribution. $492.36 <br /> 5. Seed, Fertilize, Mulch. $1,282.94 <br /> XII AVF Wells $718.95 <br /> XIII YAW Wells $602.95 <br /> XIV Monitoring Wells - Big Bottom <br /> A. Sealing and Plugging $2,011.83 <br />. B. Earthwork <br /> 1. Backfilling and Grading $628.80 <br /> 2. Topsoil Redistribution. $157.20 <br /> 3. Seeding and Mulching. $129.30 <br /> -rr~~~.S;..l ;... , <br /> XV Monitoring Well and Boreholes $7,642.70,~~v 9,~,t <br /> XVI lf5 Mine Water Tap <br /> A. Structure Removal <br /> ~ <br /> 1. Concrete Wall $4,944.24 <br /> 2. Concrete Disposal .$82.20 <br /> <br />vi <br />