Laserfiche WebLink
W. F. STRIP PIT T.R. <br />May 1987 <br />VII Williams Fork Strip Pit No. 2 <br /> A, Earthwork <br /> 1. Grade and Fill $90,500.00 c~'~~4p~ <br /> <br /> 2. Topsoil Redistribution $41,132.00 <br /> 3. Seed, Mulch, Fertilize $61,194.33 ~9 a~8 a ~ <br />VIII Access Road to Dewatering Holes - #5 Mine <br /> A. Earthwork <br />i <br /> 1. Remove Fi 11 . . $426.00 <br /> 2. Replace Topsoil. .$218.00 <br /> 3. Seeding and Mulching $20.00_ <br />IX Underground Reservoir 6104.00 <br />. A. Structure Removal <br /> 1. Pump House Removal .5172.20\ 1 <br />/ <br /> B. Earthwork <br /> 1. Backfill and Topsoil $65.00 <br /> 2. Seeding and Mulching $6.41 <br />X Guard Rail Removal ,.A.~~~ <br /> A. Structure Removal <br /> 1. Guard Rail .$1,376.00 <br />• <br />vR <br />