Laserfiche WebLink
IV Refuse Pile <br /> A. Earthwork <br /> 1. Grade and Fill. .$21,100.00 <br /> 2. Topsoil Redistribution. .$79,279.20 <br /> 3. Seed, Mulch, Fertilize. .$17,319.00 <br /> tl <br /> V Old Shop Area and Rock Dust Tank <br /> A. Structure Removal <br /> 1. Foundation. $9,810.00 <br /> B. Earthwork <br /> 1. Grade and Fill. .$26,049.10 <br /> 2. Topsoil Redistribution. $764.40 <br /> 3. Seed, Mulch, Fertilize. $5,773.00 <br /> VI Town Loadout `~~ ~-~ ~' ' <br />• <br /> A. Structure Removal <br /> 1. Footing $1,589.00 <br />~ <br />~~)'°`~ <br /> B. Earthwork o O` <br />~ <br />~s` <br /> 1. Earthwork $5,970.00 <br /> 2. Topsoil Redistribution. $5,460.00 <br /> 3. Seed, Mulch, fertilize. $2,373.00 <br /> <br />iv <br />