Laserfiche WebLink
w <br />. II No. 5A Portal Area <br /> A. Removal of Structures <br /> 1. Pushwalls. .$988.80 <br /> 2. Retaining Wall .$906.40 <br /> 3. Fuel Island. .$448.83 <br /> 4. Pole Barn. $25,978.00 <br /> B. Earthwork <br /> 1. Portal Area. .$577,100.00 <br /> 2. Pond SA-PI .$2,800.00 <br /> 3. Seed, Mulch, Fertilize $16,998.00 <br />~- <br /> I I I No. 9 Portal Area ~ ~~'~ f' •- ~ ~ <br /> A. Structure Removal <br /> 1. Bathhouse <br /> Warehouse <br />• Lamphouse. .$4,278.00 <br /> 2. Fans, Belt Structure, Belt Drive, <br /> ~ <br />Transformer, Generator, <br /> Tanks, Earthwork .$847,870.50 <br /> B. Earthwork <br /> 1. Dewatering Grading .$8,400.00 <br /> 2. Topsoil Redistribution $75,439.00 <br /> 3. Seed, Mulch, Fertilize $24,054.00 <br /> -- <br />9 ~o~y( <br />n <br />u <br />;;; <br />