Laserfiche WebLink
Summary of Reclamation Costs <br />I. No. 5 Portal Area <br />A. Removal of structures <br />1. Silo .$12,431.15 <br />2. Training Center <br /> Main Offices <br /> Safety Trailer <br /> Engineering Trailer <br /> Womans Bathhouse <br /> Drafting Trailer <br /> Old Drafting Trailer $8,556.00 <br />3. Warehouse and Shop $9,278.10 <br />4. Fuel Island. $4,363.40 <br />5. Washdown Pad .$12,124.26 <br />6. (Un)loading Ramps. $6,860.00 <br />,~ <br />B. Earthwork <br />1. Railroad $128,900.00 <br />2. Topsoil Redistribution .$46,641.14 <br />3. Grade and Fill .$76,380.00 <br />4. Dewatering Ponds <br />Sewage Treatment Ponds <br />Sediment Ponds $5,880.00 <br />5. Seed, Mulch, Fertilize .$13,279.88 <br />-~^- ~`l~ b9 ~7 <br /> <br />ii <br />