Laserfiche WebLink
<br />XIV. MONITORING WELL 83-03 <br />BIG BOTTOM AREA <br />• <br />Sealing & Plugging <br />(assume 4" well) <br />1,200' will require 50 sacks of cement @ $7.65/sack <br />Rig time - 10 hours @ $141.50 = <br />Water <br />Expanding plug <br />EARTHWORK <br />Backfilling & grading <br />Use small tractor - $78.60/hr. x 8 hrs. _ <br />$382.50 <br />$1,415.00 <br />$213.33 <br />$1.00 <br />$628.80 <br />• <br />Topsoil redistribution <br />Use small tractor - $78.60/hr. x 2 hrs. _ <br />Seeding and mulching <br />.2 ac x $641.45/ac = <br />Total = <br />$157.20 <br />$128.30 <br />$2,926.13 <br />16 <br />