Laserfiche WebLink
• . / • <br /> XV. MONITORING WELLS BOREHOLES <br />Well or Expanding <br />Borehole Depth Diameter Cement Rig Time Water Plug Labor Total <br />82-03a~cl-03a~ 513' 2" la- $92 $142 $25 $1 $20.60 $273.60 <br />84-04a (a"~ -~y°~ 575' 2" la•~ $99 $142 $25 $1 $20.60 $280.60 <br />81-19~ 650' 2" 1`~• $ $113 $142 $25 $1 $20.60 $301.60 <br />TR-4 ~ 1,325' 2" ~~ $231 $50 $50 $1 $20.60 $585.60 <br />TR-7~ 725' 2" I~~~ $126 $142 $25 $1 $20.60 $314.60 <br />81-01~ ~ \,~? <br />~ <br />Q <br />a~ 533' 2" ~}- $92 $142 $25 $1 $20.60 $280.60 <br />~ <br />. <br />Dewatering Holes 1,040' 18" $1,975 $283 $50 $20 $26.60 $2,348.60 <br />r <br />J <br />83-02' 740' 4" $492 $142 $25 $'L $20.60 $681.60 <br />83-04 ~ 509' 6" $526 $142 $25 $6 $20.60 $719.60 <br />Fuel Borehole ~'. 360' S" $240 $142 $25 $8 $20.60 $435.60 <br />Power Borehole toy s~~o 228' 8" $152 $142 $25 $8 $20.60 $347.60 <br /> <br />#4 Mine Injection ~ 220' 6" $98 $142 $25 $6 $20.60 $288.60 <br />Pumping'? 200' 6" $89 $142 $25 $6 $20.60 $282.60 <br />84-01- 960' 2" $172 $283 $25 $1 $20.60 $501.60 <br />$7,642.70 <br />NOTE <br />cement = $7.65/sack <br />riy time = $141.5/hr. <br />