Laserfiche WebLink
XIII. YAW WELLS <br /> Expanding <br /> Depth Diameter Cement Rig Time Water ~ Plug Labor Total <br />YAW-1 21' 2" $7.65 .5 hr = $70.75 $16 $1 $20.60 $116 <br />YAW-2 15' 2" $7.65 .5 hr = $10.75 $16 $1 $20.60 $116 <br />YAW-3 19' 2" $7.65 .5 hr = $70.75 $16 $1 $20.60 $116 <br />YAW-4 15' 6" $30,60 .5 hr = $70.75 $16 $1 $20.60 $138.95 <br />~ YAW-5 17' 2" $7.65 .5 hr = $70.75 $16 $1 $20 <br />60 $116 <br /> . <br />$602.95 <br />NOTE <br />cement = $7.65/sack <br />rig time = $141.50/hr. <br />