Laserfiche WebLink
XII. AVF WELLS <br /> Expanding <br /> Uepth Diameter Cement Rig Time Water Plug Labor Total <br />AVF-1 16' 2" $7.65 .5 hr = $70.75 $16 $1 $20.60 $116 <br />AVF-2 16' 2" $7.65 .5 hr = $70.75 $16 $1 $20.60 $116 <br />AVF-3 1 4" $15.30 .5 hr = $70.75 $16 $1 $2C.60 $123.65 <br />AVF-4 1 2" $7.65 .5 hr = $70.75 $16 $1 $20.60 $116 <br />r <br />AVF-5 15' 4" $15.30 .5 hr = $70.75 $16 $1 $20.60 $123.65 <br />AVF-6 15' 4" $15.30 .5 hr = $70.75 $16 $1 $20.60 $123.65 <br />$718.95 <br />NOTE <br />cement = $7.65/sack <br />rig time = $141.50/hr. <br />