Laserfiche WebLink
• <br />• <br />XI. CRUSHER SITE <br />REMOVAL OF STRUCTURES <br />Labor - 4 hrs. @ $20.60/hr. _ $82.40 <br />Equipment - D-8 - 2 hrs. @ $193.47/hr. _ $366.93 <br />EARTHWORK <br />Fill redistribution <br />Labor - 2 hrs. @ $20.60/hr. _ $41.20 <br />Equipment - D-8 - 2 hrs. @ $193.47/hr. _ $366.93 <br />Equipment - D-8 - 4.3 hrs. @ $193.47/hr. _ $831.92 <br />300 hp hydraulic ripper-4.3 hrs. @ $23.68/hr. _ $94.71 <br />Grading <br />Use 16 G grader - 2 hrs. @ $193.47/hr. _ $366.93 <br />Labor - 2 hrs, @ $20.60/hr. _ $41.20 <br />Ripping <br />Topsoil Redistribution <br />Use D-8 - 2.3 hrs. @ $193.47/hr. _ $444.98 <br />Labor - 2.3 hrs. @ $20.60/hrs. _ $47.38 <br />Seeding, fertilizing, and mulching <br />~2 ac x $641.47/ac = $1,282.94 <br />Total = $3,967.52 <br />• <br />13 <br />