Laserfiche WebLink
. II. #5A PORTAL <br />REMOVAL OF STRUCTURE <br />Pushwalls <br />Labor 8 hrs. @ $20.60/hr. <br />~ Equipment-D-B - 4 hr. @ $206/hr. <br />Retaining Wall <br />Labor 8 hrs @ $20.60/hr. <br />Equipment-D-B 4 hr @ $206/hr. <br />Fuel Island <br />Pad .5 ft. <br />Demolition <br />Removal of <br />Disposal o <br />$2.90/cy x <br />x 22 ft. x 25 ft. = 275 cf - 10.2 cy <br />$0.14/cf x 275 = <br />cover = <br />F pad <br />10.2 = <br />Pole Barn <br />Demolition <br />~~ 70 x 100 x 15 = 105,000 cf <br />105,000 cf x $0.14/cf = <br />Disposal <br />105,000 cf - 27 cf = 3,889 cy <br />3,889 cy x $2.90/cy = <br />EARTHWORK <br />Portal area <br />~ 200 hp dozer 150' push <br />290,000 cy @ $1.99/cy = <br />Pond 5A-P1 <br />/ 200 hp dozer 50' push <br />8,000 cy @ $0.84/cy <br />Seeding, mulchin ertilizing <br />$641.45/ac x 6.5 a~ <br />Total #5A Portals = <br /> <br />$164.80 <br />$824.00 <br />$82.40 <br />$824.00 <br />$19.25 <br />$400.00 <br />$29.58 <br />$14,700.00 <br />$11,278.00 <br />$577,100.00 <br />$2,800.00 <br />$16,998.43 <br />$625,220.46 <br />4 <br />