Laserfiche WebLink
_~ <br />III. #9 PORTALS <br />REMOVAL OF STRUCTURES <br />vBathhouse, warehouse, and lamphouse - removed $4,278.00 <br />Fans, belt structure, belt drive, transformer, <br />generator, & tanks <br />foundations 2.36/sq. ft. x 6,000 sq. ft. _ $14,160.00 <br />200 hp dozer 150' push <br />earthwork 418,950 cy @$1.00/cy = $833,710.50 <br />EARTHWORK ~~ <br />., <br />A P~ Q~ <br />ewatering system -grading ~"; ~' <br />200 hp dozer, 50' push, no compact' n ~_r~ <br />10,000 cy @ $0.84/cy $8,400.00 <br />Topsoil Redistribution <br />$1.82/cy x 41,450 cy = $75,439.00 <br />Seeding, mulchi.ng,'fertilizing <br />$641.45/ac x~7j ac = $24,054.00 <br />Total #9 Portals = $960,041.50 <br /> <br />5 <br />