Laserfiche WebLink
WATERLINE <br />Removal and backfilling <br />Backhoe @ $40/hour x 16 hours = $ 640.00 <br />• Pipe disposal <br />Volume of cylinder = r'h <br />3.14 ( . 17') (400' ) = 36. 3 ft'/27 ft'/yd' = 1.34 cy <br />1.34 cy x $2.90/cy = $ 3.88 <br />EARTHWORK <br />Railroad <br />39,000 cy smooth and grade <br />haul to #5 portal area 29,000 cy <br />9-20 cy dump trailers 2 mile round trip <br />pg. 317 item 7,400 <br />$3.05 /cy x 39,000 cy = $118,950.00 <br />5,000 cy material, 150' push <br />pg. 36 163 - 4,220 <br />5,000 cy x $1.99/cy $ 9,950.00 <br />Topsoil Redistribution <br />pg. 36 164-2,300 <br />25,627 Cy x $1.82/cy $ 46,641.14 <br />• Grade and Fill <br />38,000 Cy <br />pq. 39 (200 - 0800) + (200 - 1,400) <br />$.55/cy + 41.46/cy = $2.01/cy <br />38,000 Cy x $2.01/cy = $ 76,380.00 <br />Dewatering ponds, sewage treatment ponds, <br />and sediment ponds <br />dozer pushing and grading <br />200 hp 50' push/no compaction <br />pg. 35 163 - 4,020 <br />$.84/cy x 7,000 cy = $ 5,880.00 <br />Seeding, mulching, fertilizing <br />Cost increased 8.25$ which <br />is an average since 1983 <br />500/ac (1983)/.9175 = $641.45/ac <br />$641.45/ac x 20.7 ac = $ 13,279.88 <br />• Total #5 Portal = $326,913.81 <br />3 Revised 09/05/90 <br />