My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-11-24_PERMIT FILE - P2014007
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2014007
>
2014-11-24_PERMIT FILE - P2014007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:55:35 PM
Creation date
11/25/2014 7:14:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2014007
IBM Index Class Name
Permit File
Doc Date
11/24/2014
Doc Name
NOI Approval with FW Due.
From
DRMS
To
Krystle M. Dorris
Email Name
TC1
TAK
BJC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WHEEL LOADER - LOAD AND CARRY WORK <br />Task description: Backfill 4 Digs <br />Site: American Dream Exploration Permit Action: Initial Estimate <br />PROJECT IDENTIFICATION <br />Task #: 001 State: Colorado <br />Date: 11/7/2014 County: Teller <br />User: TCI <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 924G <br />Attachment 1: ROPS Cab <br />Cost Breakdown: <br />Page 1 of 2 <br />Permit /Job #: P2014007 <br />Abbreviation: None <br />Filename: P007 -001 <br />Horsepower: 128 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />MATERIAL OUANTITIES <br />Initial volume: 3,260 CCY Swell factor: 1.000 <br />Loose volume: 3,260 LCY <br />Source of estimated volume: DRMS: 4 sites @ — 815CY each (- 8ftx50ftx50ft)* 1.1 SF <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Loader Cycle Time: Unadjusted Basic Cycle Time (load, dump, maneuver): <br />0.475 <br />minutes <br />Cycle Time Factors <br />Length <br />(feet) <br />Factor (min.) <br />Utilization % <br />Ownership Cost/Hour: <br />$12.27 <br />0.000 <br />NA <br />Operating Cost /Hour: <br />$29.88 <br />0.000 <br />100 <br />Operator Cost/Hour: <br />$37.13 <br />0.000 <br />NA <br />Total Unit Cost/Hour: <br />$79.28 <br />0.000 <br />Total Fleet Cost/Hour: <br />$79.28 <br />Nominal target 0.00 <br />0.000 <br />MATERIAL OUANTITIES <br />Initial volume: 3,260 CCY Swell factor: 1.000 <br />Loose volume: 3,260 LCY <br />Source of estimated volume: DRMS: 4 sites @ — 815CY each (- 8ftx50ftx50ft)* 1.1 SF <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Loader Cycle Time: Unadjusted Basic Cycle Time (load, dump, maneuver): <br />0.475 <br />minutes <br />Cycle Time Factors <br />Length <br />(feet) <br />Factor (min.) <br />Source <br />Material: <br />No adjustment - factor not applicable 0.00 <br />0.000 <br />(Cat HB) <br />Stockpile: <br />No adjustment - factor not applicable 0.00 <br />0.000 <br />(Cat HB) <br />Truck Ownership: <br />No adjustment - factor not applicable 0.00 <br />0.000 <br />(Cat HB) <br />Operation: <br />No adjustment - factor not applicable 0.00 <br />0.000 <br />(Cat HB) <br />Dump Target: <br />Nominal target 0.00 <br />0.000 <br />(Cat HB) <br />Net Cycle "lure Adjustment: <br />Adjusted Basic Cycle Time: <br />U.000 <br />0.475 <br />Rolling Resistance — Road Conditions <br />Haul: Rutted dirt, little maintenance, no water, 2" tire penetration 5.0 <br />Return: Rutted dirt, little maintenance, no water, 2" tire penetration 5.0 <br />Haul and Return Time <br />rmnutes <br />minutes <br />CIRCES Cost Estimating Software <br />Length <br />(feet) <br />Grade Res. <br />( %) <br />Rolling <br />Res. ( %) <br />Total Res. <br />( %) <br />Travel Time <br />(minutes) <br />Source <br />Haul Route: <br />25 <br />-5.00 <br />5.00 <br />0.00 <br />0.0088 <br />(Cat HB) <br />Return Route: <br />25 <br />5.00 <br />5.00 <br />10.00 <br />0.0281 <br />(Cat HB) <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.