Laserfiche WebLink
Loader Worksheet Cont'd <br />Task # 001 <br />Total Travel Time <br />Total Cycle Time <br />Load Bucket Capacity <br />Rated Capacity: 2.70 LCY (heaped) <br />Bucket Fill Factor: 1.100 Other - rock/dirt mixtures (100 -1 <br />Adjusted Capacity: 2.97 LCY <br />Job Condition Correction Factors <br />Site Altitude: 8500 feet <br />Page 2 of 2 <br />0.0369 minutes <br />0.5119 minutes <br />/o) 1.100 <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift /day) <br />Net Correction: 0.83 multiplier <br />Unadjusted Hourly Unit Production: 348.09 LCY/Hour <br />Adjusted Hourly Unit Production: 288.92 LCY /Hour <br />Adjusted Hourly Fleet Production: 288.92 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Loader(s) Total job time: 11.28 <br />Unit cost: $0.274 /LCY Total job cost: $895 <br />Hours <br />CntCES Cost Estimating Software <br />