Laserfiche WebLink
Mobilization Worksheet Cont'd Task # 004 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region <br />Total one -way travel distance <br />Average Travel Speed <br />Total Non - Roadable Mob /Demob Cost <br />* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />** one round trip, no haul rig: <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Non - Roadable <br />Equipment <br />Roadable <br />Equipment <br />0.83 <br />0.83 <br />0.83 <br />0.83 <br />0.25 <br />NA <br />0.25 <br />NA <br />2.17 <br />1.67 <br />Page 2 of 2 <br />WOODLAND PARK <br />25.00 miles <br />30.00 mph <br />$1,906.77 <br />$0.00 <br />Total job time: 4.33 Hours <br />Total job cost: $1,907 <br />CIRCES Cost Estimating Software <br />