Laserfiche WebLink
EQUIPMENT MOBILIZATIONMEMOBILIZATION <br />Task description: Mob/Demob <br />Site: American Dream Exploration Permit Action: Initial Estimate <br />PROJECT IDENTIFICATION <br />Task #: 004 State: Colorado <br />Date: 11/7/2014 County: Teller <br />User: TC 1 <br />Agency or organization name: DRMS <br />EQUIPMENT TRANSPORT RIG COST <br />Page 1 of 2 <br />Permit /Job #: P2014007 <br />Abbreviation: None <br />Filename: P007 -004 <br />Shift basis: 1 per day <br />Cost Data Source: CRG Data <br />Truck Tractor Description: GENERIC ON- HIGHWAY TRUCK TRACTOR, 6X4, DIESEL POWERED, <br />400 HP (2ND HALF, 2006) <br />Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT TRAILER <br />(25T, 50T, AND I OOT) <br />Cost Breakdown: <br />Available Rig Capacities <br />0 -25 Tons <br />26 -50 Tons <br />51+ Tons <br />Ownership Cost/Hour: <br />$16.63 <br />$18.37 <br />$22.33 <br />Operating Cost/Hour: <br />$44.38 <br />$46.13 <br />$50.07 <br />Operator Cost/Hour: <br />$27.66 <br />$27.66 <br />$27.66 <br />Helper Cost/Hour: <br />$0.00 <br />$25.39 <br />$25.39 <br />Total Unit Cost/Hour: <br />$88.67 <br />$117.55 <br />$125.45 <br />NON ROADABLE EQUIPMENT: <br />Machine <br />Weight/ <br />Owner ship <br />Haul Rig <br />Fleet <br />Haul Trip <br />Return Trip <br />DOT Permit <br />Description <br />Unit <br />Cost/hr/ unit <br />Cost/hr /unit <br />Size <br />Cost/hr/ <br />Cost/hr/ fleet <br />Cost/ fleet <br />(TONS) <br />fleet <br />CAT 924G <br />12.69 <br />$12.27 <br />$88.67 <br />1 <br />$100.94 <br />$88.67 <br />$250.00 <br />Drill/Broadcast <br />25.00 <br />$39.59 <br />$88.67 <br />1 <br />$128.26 <br />$88.67 <br />$250.00 <br />Seeder with Tractor <br />Subtotals: 1 $229.20 $177.34 1 $500.00 <br />ROADABLE EQUIPMENT: <br />Machine Description Total Cost/hr/ unit Fleet Size Haul Trip Return Trip <br />Cost/hr/ fleet Cost/hr/ fleet <br />Subtotals: $0.00 <br />CIRCES Cost Estimating Software <br />