Laserfiche WebLink
6.No drill or auger holes are anticipated. <br /> 7.Spoil slopes shall not exceed 3H to 1V. <br /> 8.All areas will be graded to allow it to be traversed by farm machinery. <br /> 9.Only native on-site materials will be used. <br /> 10. No pollutants will be released. Oils and lubricants will be confined and <br /> contained. <br /> 11.No groundwater contamination will occur. <br /> d) Reclamation Implementation <br /> Topsoil Preservation,Storage,and Replacement: <br /> Topsoil ranges from 4"to 6" throughout the area.All avaiable topsoil will be stripped prior <br /> to mining in any phase. Topsoil will be segregated in stockpiles or used to construct <br /> perimeter berms. As areas are reclaimed and graded to final conditions (as shown on <br /> Exhibit F); topsoil from the stockpiled areas will be placed on the graded reclaimed area to <br /> average depth present at pre-mining. Care will be used to prevent excessive compaction of <br /> the topsoil zone. <br /> Seeding: <br /> Final seeding will occur in the topsoil zones. Seeding of the graded and topsoil covered <br /> reclamation areas shall occur between November 1st and May 15th, if the site must be <br /> seeded outside of this date range,a long-season grain such as wheat or oats shall be planted <br /> to aid in stabilization until the reclamation seed mix can be sowed.The area will be seeded <br /> as follows: See Attached recommendation from Weld County NRCS Department. (EXHIBIT <br /> E-1) <br /> Exkib�,� E Ps 3o�S <br />