Laserfiche WebLink
a) The gravel surfaced access road to remain per request of property owner. <br /> b) Pre-&Post Mining Conditions <br /> The present land use is ranching and upon final reclamation the post mining use will revert <br /> back to ranching. The final reclamation slopes (with exception of possible 3H: 1V slopes at <br /> the setback line) and most of the grading areas will be of gentler slopes then originally <br /> present As such,the area will provide an improved ranching environment. <br /> c) Compliance with Rule 3.1 Reclamation Performance Standards: <br /> 3.1.1 Establishing Post-Mining Use: <br /> 1.Area is used as ranching land and will be returned to ranching land. <br /> 3.1.2 Reclaiming Substituted Land: <br /> No substitution land is involved. <br /> 3.1.3 Time Limit and Phased Reclamation: <br /> Each mined area (Phase) will be completely reclaimed within 5 years of <br /> commencement of the reclamation phase of the mined area(Phase). <br /> 3.1.4 Public Use: <br /> No public use is allowed. Lands are private at present and will continue to be <br /> private. <br /> 3.1.5 Reclamation Measures-Material Handling: <br /> 1.Final reclaimed topography will be appropriate for final land use. <br /> 2. All backfilling will consist of existing formations. No acid-forming or toxic <br /> materials are known. <br /> 3. All erosion will be controlled by use of benches, silt fence, and waddles where <br /> needed no high walls will remain. <br /> 4. Backfilling and grading will be ongoing as areas are mined out and room for <br /> backfilling becomes available.Topsoil will be stripped on one phase and replaced in <br /> a phase that mining has been completed on. The maximum disturbed area at any <br /> time during the life of the mine will be 25.88 when phases 6 and 7 are open. <br /> 5.No refuse or acid-forming or toxic-producing materials are known. <br />