My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-11-17_PERMIT FILE - M2014064
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2014064
>
2014-11-17_PERMIT FILE - M2014064
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2020 9:39:03 PM
Creation date
11/18/2014 7:05:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2014064
IBM Index Class Name
Permit File
Doc Date
11/17/2014
Doc Name
New 112c Application
From
VCA Aggregates LLC
To
DRMS
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT E <br /> Reclamation Plan <br /> a) Reclamation Methods <br /> The general mining reclamation plan consists of a backfill operation that moves stockpiled <br /> top soil back into the mined out areas to be used for final reclamation.During mining <br /> operations,4"to 6"of topsoil will be stockpiled on the We-side of each phase.After mining <br /> has been completed for a phase,these topsoil stockpiles will be excavated and relocated to <br /> provide a natural-looking landform that provides drainage consistent with the pre-mining <br /> condition.The final elevations will depend on the actual quantity of materials available on <br /> the site.No importing of materials is anticipated.Separately stockpiled topsoil will be <br /> spread over the graded surface and then seeded with native grasses and mulched with <br /> straw.The staging process,final condition and seeing requirements are outlined on Exhibit <br /> F-Reclamation Plan Map. <br /> Mining Areas: <br /> Once mined out areas are available to receive topsoil material,the available soil will be <br /> moved to the final location.The final grades will not be steeper than 3 horizontal to 1 <br /> vertical.The concept grading plan is shown on Exhibit F.the reclamation of phases will be <br /> performed as work progresses. <br /> Stockpiling activities will be ongoing by depositing topsoil into mined out areas,as <br /> necessary and as the areas become available.Please refer to Mining Plan Map,for possible <br /> topsoil stockpile locations in each Mining Area.Final reclamation will continue by grading, <br /> spreading topsoil,and reseeding the reclaimed areas. (Please refer to Exhibit F- <br /> Reclamation Plan Map for final reclamation grading.) <br /> At the commencement of reclamation for any phase,it is anticipated that reclamation <br /> activities will continue for 5 years after the phase's reclamation commencements to move <br /> stockpiles,spread topsoil and seed. <br /> Processing Site&Haul Roads: <br /> Exh;b <br />
The URL can be used to link to this page
Your browser does not support the video tag.