My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-10-29_REVISION - C2010089
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2010089
>
2014-10-29_REVISION - C2010089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:55:08 PM
Creation date
10/29/2014 8:32:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Revision
Doc Date
10/29/2014
Doc Name
Cost Estimate
From
Susan Burgmaier
To
Rob Zuber
Type & Sequence
TR6
Email Name
SLB
RDZ
MPB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
New Horizon North Mine (C2010089) Technical Revision No. 6 <br />Task description: R <br />Site: New Horizon North Mine <br />BULLDOZER WORK <br />Pond NHN -002 <br />Permit Action: Technical Revision 6 <br />PROJECT IDENTIFICATION <br />Task #: 041 State: Colorado <br />Date: 10/28/2014 County: Montrose <br />User: SLB <br />Agency or organization name: DRMS <br />Page 2 of 7 <br />Permit/Job #: C2010089 <br />Abbreviation: None <br />Filename: C089 -041 <br />HOURLY EQUIPMENT COST <br />(AVG.) <br />0.900 <br />Basic Machine: Cat D9T - 9SU <br />1.000 <br />(GEN.) <br />Horsepower: 405 <br />(AVG.) <br />0.830 <br />Blade Type: Semi- Universal <br />0.800 <br />(FND -RF) <br />Attachment: 3 -shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: <br />$81.10 <br />NA <br />Operating Cost/Hour: <br />$143.16 <br />100 <br />Ripper op. Cost/Hour: <br />$2.23 <br />25 <br />Operator Cost/Hour: <br />$38.01 <br />NA <br />Total unit Cost/Hour: $264.49 <br />Total Fleet Cost/Hour: $264.49 <br />MATERIAL QUANTITIES <br />Initial Volume: 20,973 <br />Swell factor: 1.125 <br />Loose volume: 23,595 LCY <br />Source of estimated volume: Pond NI-IN-002 Plan and Profile; Figure 3 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 75 feet <br />Unadjusted hourly production: 1,514.3 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />5,000 feet <br />2,650 lbs/LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />0.750 <br />(AVG.) <br />0.900 <br />(CAT HB)) <br />1.000 <br />(GEN.) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />0.800 <br />(FND -RF) <br />
The URL can be used to link to this page
Your browser does not support the video tag.