Laserfiche WebLink
New Horizon North Mine (C2010089) Technical Revision No. 6 Page 3 of 7 <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.868 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.3890 <br />Adjusted unit production: 589.06 LCY/hr <br />Adjusted fleet production: 589.06 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.449/LCY <br />Total job time: <br />Total job cost: <br />40.05 Hours <br />$10,594 <br />