My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-10-29_REVISION - C2010089
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2010089
>
2014-10-29_REVISION - C2010089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:55:08 PM
Creation date
10/29/2014 8:32:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Revision
Doc Date
10/29/2014
Doc Name
Cost Estimate
From
Susan Burgmaier
To
Rob Zuber
Type & Sequence
TR6
Email Name
SLB
RDZ
MPB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
New Horizon North Mine (C2010089) Technical Revision No. 6 <br />COST SUMMARY WORK <br />Task description: Pond NHN -002 and ditch costs based on as -built designs <br />Permit Action: Technical <br />Site: New Horizon North Mine Revision 6 <br />PROJECT IDENTIFICATION <br />Task #: OOD State: Colorado <br />Date: 10/29/2014 County: Montrose <br />User: SLB <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Page 1 of 7 <br />Pennit/Job #: C2010089 <br />Abbreviation: None <br />Filename: C089 -OOD <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />041 <br />045 <br />046 <br />40C <br />45C <br />46C <br />Regrade Pond NHN -002 <br />DOZER <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />40.05 <br />$10,594.00 <br />$904.00 <br />$306.00 <br />($7,780.38) <br />($382.90) <br />($71.57) <br />Regrade Ditch NHN -002 North <br />DOZER <br />3.42 <br />Regrade Ditch NHN -002 South <br />DOZER <br />1.16 <br />Credit for prior Task 041 <br />NA <br />-29.79 <br />Credit for prior Task 045 <br />NA <br />-1.47 <br />Credit for prior Task 046 <br />NA <br />-0.27 <br />SUBTOTALS: <br />13.1 <br />$3,569 <br />INDIRECT COSTS <br />0.00 <br />OVERHEAD AND PROFIT: <br />Engineering work and /or contract/bid preparation: <br />Liability insurance: <br />2.02% <br />Performance bond: <br />1.05% <br />Job superintendent: <br />6.55 hrs <br />Profit: <br />10.00% <br />Total <br />Total <br />Total <br />Total <br />TOTAL O & P <br />CONTRACT AMOUNT (direct + O & P) <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />$72.09 <br />$37.47 <br />$492.30 <br />$356.90 <br />$958.76 <br />$4,527.76 <br />Financial warranty processing (legal /related costs): <br />0.00 <br />Total = 0.00 <br />Engineering work and /or contract/bid preparation: <br />4.61% <br />Total = $208.73 <br />Reclamation management and /or administration: <br />3.58% <br />$162.09 <br />CONTINGENCY: <br />0.00 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $1,329.58 <br />TOTAL BOND AMOUNT (direct + indirect) = $4,898.58 <br />
The URL can be used to link to this page
Your browser does not support the video tag.