My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-10-15_PERMIT FILE - C1996083A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2014-10-15_PERMIT FILE - C1996083A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:48:54 PM
Creation date
10/23/2014 1:34:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
10/15/2014
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
445
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 2 Mine C1996083 Minor Revision No. 164 Page 5 of 8 <br />BULLDOZER WORK <br />Task description: Re- topsoil CWI- DH -58A <br />Site: Bowie No. 2 Mine Permit Action: Minor Revision 164 Permit/Job #: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: 376 <br />Date: 10/10/2014 <br />User: SLB <br />State: Colorado <br />County: Delta <br />Agency or organization name <br />HOURLY EOUIPMENT COST <br />Basic Machine: <br />Cat 139T - 9SU <br />Horsepower: <br />405 <br />Blade Type: <br />Semi - Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />DRMS <br />Utilization % <br />$72.57 NA <br />$143.16 100 <br />$0.00 0 <br />$38.01 NA <br />$253.73 <br />$253.73 <br />MATERIAL QUANTITIES <br />Initial Volume: 1,682 <br />Swell factor: 1.125 <br />Loose volume: 1,892 LCY <br />Source of estimated volume: DRMS - 0.75' over 1.39 acres <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Materials consistency description: <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />100 feet <br />1,243.2 LCY /hr <br />Consolidated stockpile 1.0 <br />20% <br />7,725 feet <br />2.550 lbs/LCY <br />Earth - Dry packed <br />Abbreviation: None <br />Filename: C083 -376 <br />Job Condition Correction Factor <br />Source <br />Operator Skill: <br />0.750 <br />AVG. <br />Material consistency: <br />1.000 <br />(CAT HB <br />Dozing method: <br />1.000 <br />GEN. <br />Visibility: <br />1.000 <br />AVG. <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.