Laserfiche WebLink
Bowie No. 2 Mine C 1996083 Minor Revision No. 164 Page 4 of 8 <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />0.830 <br />(1 SHIFT/DAY) <br />0.800 <br />(FND -RF) <br />0.545 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.793 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.2152 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />267.54 LCY /hr <br />267.54 LCY /hr <br />Fleet size: <br />1 Dozer(s) <br />Unit cost: <br />$0.948/LCY <br />Total job time: <br />14.65 Hours <br />Total job cost: <br />$3,717 <br />CIRCES Cost Estimating Software <br />