Laserfiche WebLink
Bowie No. 2 Mine C1996083 Minor Revision No. 164 Page 6 of 8 <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />0.830 <br />(1 SHIFT/DAY) <br />0.800 <br />(FND -RF) <br />0.545 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.902 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.2448 <br />Adjusted unit production: 304.34 LCY /hr <br />Adjusted fleet production: 304.34 LCY /hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.834/LCY <br />Total job time: 6.22 Hours <br />Total job cost: $1,578 <br />CIRCES Cost Estimating Software <br />