Laserfiche WebLink
ameO <br /> P285 to P286; P288 to P290; P292; P320 to P331; P377 to P382; P369 to P372; P384 to P388; <br /> P401; P412 toP413; and P429 to P430 <br /> See the attached DCF map for all placement. <br /> F) High Volume Solution Collection System Piping (HVSCS): <br /> 4, 12, and 24-inch ADS HVSCS piping was laid out on the on the PSSA inboard slopes. <br /> Ames performed 28-inch HDPE pipe perforation drilling at the Dump 4 pad; '/z-inch holes, 12 inch <br /> spacing, 8 holes in the pipes circumference, as per project plans. After the pipes were perforated <br /> they were transported to the PSSA ADR ramp. <br /> Fusion welding occurred on the HVSCS HDPE 28-inch piping in the PSSA floor. <br /> The HVSCS vertical riser bases were cleaned and realigned to plan positioning. <br /> DCF material inside the HVSCS manifold was cleaned. Temporary geotextile fabric was placid <br /> over the T-section openings of the pipe to prevent rock from entering the manifold. <br /> 11) Storm Water Management <br /> Best Management Practices(BMPs) are being performed. <br /> CQA ACTIVITIES: <br /> 1) Field Activities: Field activities and observation during this reporting period included: Slope grading <br /> and fill placement, Phase 1 geomembrane deployment, material sampling and testing; geomembrane <br /> repair monitoring, and acceptance; nuclear density and moisture testing; depth checks; and <br /> acceptance on the Phase 1 SLF, HVSCS pipe cleaning; HVSCS HDPE piping perforation and fusion, <br /> ADS HVSCS piping layout; LVSCF acceptance for primary liner deployment; and DCF sampling. <br /> II) Laboratory Activities: Permeability, Atterberg limits, moisture, and sieve analysis laboratory tesIng <br /> continued. <br /> The following samples were collected and returned to AMEC's laboratory for analysis: <br /> Drain Cover Fill sample DCF 113(Control sample) <br /> Drain Cover Fill samples DCF 7-13 through DCF 11-R (Record samples) <br /> Select Structural Fill sample 1SSF 2-R (Record sample) <br /> Underdrain Fill sample 1 OF 3-R (Record sample) <br /> Structural Fill sample SF 97-R (Record sample) <br /> Cylinders of grout were cast from the grouted riprap on the ends of the MSE wall adjacent to <br /> Highway 67. <br /> 2014 10 11-MLE2 WEEKLY FINAL Page 4 cr 8 <br />