Laserfiche WebLink
ame <br /> General Prolect Items <br /> Meetings and Discussions: <br /> > Weekly Contractor Meeting October 8, 2014(CC&V,AMEC, Ames) <br /> > Weekly CC&V Health and Safety Meeting October 9,2014 <br /> > ECA daily safety meetings <br /> > Ames daily safety meetings <br /> Summary of Concerns: None. <br /> CCSV: Daily updates, reporting, and scheduling are some of the tasks occurring between CC&V <br /> Projects,AM EC, and Ames. <br /> Miscellaneous: <br /> > Riprap on the ends of the MSE wall was grouted <br /> > Surface water pumped from the sump of the PSSA <br /> Deliveries: Miscellaneous HVCSC piping and geofabric was delivered to Ames throughout this reporting <br /> period. <br /> Submitted by: Er! Date: October 14,2014 <br /> Reviewe Date: October 14, 2014 <br /> Tim Burkhard <br /> Project Resident <br /> Phone: 719-689-2986 <br /> CC&V Projects <br /> Reviewed By: Date: a <br /> Reviewed By: Si g'/�f�/r�, Date: 1,o _ ao <br /> 2014 10 11 4ALE2 WEEKLY FlNAL Page 5 of 8 <br />