My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-10-22_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-10-22_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2020 8:43:33 PM
Creation date
10/23/2014 7:29:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
10/22/2014
Doc Name
Weekly CQA Report: Week ending 10/11/14.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec -' , <br /> C) Geomembrane: <br /> PSSA <br /> Primary 100-mil DSMS(double sided microspike) LLDPE Liner Installation <br /> ECA completed 100-mil LLDPE smooth geomembrane installation in the PSSA. No additions! <br /> Panels were deployed during this reporting period, as all primary liner was completely installed <br /> during the previous week. Only QA/QC and repair work occurred. Quality control was performed <br /> using two extrusion guns. All seams were fusion welded per project technical specifications. All <br /> work performed was observed by AM EC QA personnel. <br /> Destruct samples PDF-144 through PDF-155 were tested and passed per project technical <br /> specifications. <br /> See the attached Primary Liner Map for accepted primary liner. <br /> Secondary 100-mil SSMS LLDPE Liner Installation <br /> Complete. <br /> Phase 1 80-mil DSMS LLDPE Liner Installation <br /> ECA began installation of 80-mil DSMS LLDPE Liner on the east slope from 9,550 foot bench <br /> down to the 9,450 foot bench. Panels P-1 through P-10 were deployed on approved soil liner fill <br /> material. Five full rolls of 80-mil LLDPE DSMS geomembrane were deployed yielding 1,316 <br /> lineal feet of fusion welds and 135 lineal feet of extrusion weld for an approximate installed <br /> weekly total of 33,503 square feet. All seams were welded per project technical specifications. <br /> All work performed was observed by AMEC QA personnel. <br /> DF-1 through DF-3 and DX-1 were marked but not tested. <br /> Approximately 135 lineal feet of anchor trench was backfilled over primary liner at 9,550 foot <br /> bench and compacted per project specifications. <br /> D) Low Volume Solution Collection Fill(LVSCF): <br /> PSSA <br /> The following LVSCF areas in the PSSA were placed to finished grade per project specifications, <br /> inspected, and accepted for primary geomembrane placement <br /> All areas within the PSSA have been accepted primary geomembrane placement. LVSCF <br /> finished and accepted grade is considered complete by the end of this reporting period. <br /> See the attached LVSCF map for all placement and accepted locations for primary geomembrane <br /> deployment. <br /> E) Drain Cover Fill (DCF)—Day and Night Shift: <br /> Ames crusher operations continued drain cover fill production. <br /> Light readings during the Night Shift ranged between 2.7 to 3.5 foot candles. <br /> Cat 740 trucks hauled drain cover fill to the PSSA. Haul roads for the Cat 740s were maintained <br /> at least 4 feet above the secondary geomembrane. <br /> Drain cover fill was placed on accepted primary liner in minimum 2-foot lifts in the PSSA on <br /> panels P1 to P4; P7 to P10; P13 to P15; P18 to P20; P67 to P68; P80 to P84; P87; P194 to <br /> P198; P237 to P239; P241 to P243; P246 to P249; P271 to P273; P277; P280; P282; P284; <br /> 2014 10 11-MLE2 WEEKLY FINAL Page 3 c 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.