Doc Name
Weekly CQA Report: Week ending 10/11/14.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amee <br /> Cat 740 haul trucks transported material pushed down from the slope above ADR Haul Road <br /> stations 52+00 to 55+00 to stations 88+00 to 92+00 and to Bench K stations K30+00 to K32+00 <br /> where it was placed and compacted as structural fill. <br /> Two Cat dozers were cutting the slope at the Ball Mill crossing south of the ADR Haul Road <br /> station 87+00. The material was pushed down slope and spread as structural fill upslope of <br /> Bench J stations J12+00 to J14+00. <br /> Cat 740 haul trucks transported material from the Phase 2 Diversion Channel alignment on Dump <br /> 4 near station 38+00 to 46+00 to Bench K stations K30+00 to K40+00 where it was placed and <br /> compacted as structural fill. <br /> Stockpiled cut material from slope grading near ADR Haul Road station 15+00 was transported to <br /> Bench F near station F20+00 and placed and compacted as structural fill. <br /> A Cat excavator and dozer placed cut to fill near Bench I station 110+00 to 112+00 in the Midway <br /> area. <br /> A Cat excavator and a dozer excavated the outbound haul lane near Ames' Gate 2 where it <br /> crosses the Phase 2 Diversion Channel alignment to place temporary piping allowing surface <br /> water to flow from the upper Phase 2 channel under the haul road to the Phase 2 pond. <br /> Subgrade: <br /> No new subgrade was accepted during this reporting period. See the attached figure of accepted <br /> subgrade in the Phase 1 area. <br /> Soil Liner Fill (SLF): <br /> A Cat 330 excavator with a plate tamper attachment was used to build and compact berms using <br /> SLF material on the south perimeter road near Bench P between stations PO+00 to P2+25. <br /> Soil liner fill was spread by a Cat dozer in a minimum 1-foot-loose lift above Bench B between <br /> stations B2+00 to B10+00. A Cat smooth drum roller compacted the finished grade. The soil <br /> liner fill was moisture conditioned. <br /> Soil Liner Fill was accepted for liner deployment from Bench DD to Bench B between <br /> approximate stations BO+00 to B4+00. <br /> See the attached Soil Liner Fill Map for accepted SLF in the Phase 1 area. <br /> Cameron Site: There was no SLF processing activity at the Cameron Site during this reporting <br /> period. <br /> Underdrain System: <br /> Primary Underdrain: Complete. <br /> Secondary Underdrain: No work was performed during this reporting period. <br /> Tertiary Underdrain: Approximately 400 lineal feet of tertiary underdrain was excavated, lined <br /> with non-woven geofabric, filled with underdrain material, and covered with select structural fil <br /> above Bench B station B16+00 in the Phase 1 area. This section of underdrain tied into existing <br /> secondary underdrain at the northeast corner of the PSSA crossing the ADR haul road. <br /> B) Underground Workings: <br /> No underground rernediation or confirmatory drilling occurred during this reported period. <br /> 2014 10 11-MLE2 WEEKLY FINAL Page 2o`8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.