Laserfiche WebLink
Bulldozer Worksheet Cont'd Task#001 Page 2 of 2 <br /> Dozing method: 1.000 _ (GEN.) <br /> Visibility: _ 1.000 _ _ (AVG.) <br /> Job efficiency: 0.830 (1 SHIFT/DAY) <br /> Spoil pile: 0.700 (FND-MF) <br /> Push gradient: 1.225 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 0.793 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.4233 <br /> Adjusted unit production: 416.61 LCY/hr <br /> Adjusted fleet production: 416.61 LCY/hr <br /> JOB TIME AND COST <br /> Fleet size: 1 Dozer(s) <br /> Unit cost: $0.535/LCY <br /> Total job time: 19.60 Hours <br /> Total job cost: $4,366 <br /> CIRCES Cost Estimating Software <br />