Laserfiche WebLink
Page 1 of 2 <br /> BULLDOZER WORK <br /> Task description: Final Grading=Stage 1-East Boundary Only <br /> Permit Action: Conversion <br /> Site: Williams/Illinois Gravel Pit Application Permit/Job#: M1997039 <br /> PROJECT IDENTIFICATION <br /> Task#: 001 State: Colorado Abbreviation: None <br /> -- — ---...------------- ----- <br /> Date: 8/27/2014 County: Jackson Filename: M03.9_-001 <br /> User: PSH <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D8T-8SU <br /> Horsepower: 310 <br /> Blade Type: Semi-Universal <br /> Attachment: 3-shank ripper <br /> Shift Basis: _I per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $69.05 NA <br /> Operating Cost/Hour: $108.22 100 <br /> Ripper op. Cost/Hour: $7.46 100 <br /> Operator Cost/Hour: $38.01 NA <br /> Total unit Cost/Hour: $222.73 <br /> Total Fleet Cost/Hour: $222.73 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 8,167 <br /> Swell factor: 1.000 <br /> Loose volume: 8,167 LCY <br /> Source of estimated volume: Division of Reclamation,Mining&Safety <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Average push distance: 80 feet <br /> Unadjusted hourly production: 984.2 LCY/hr <br /> Materials consistency description: Consolidated stockpile 1.0 <br /> Average push gradient: -10% <br /> Average site altitude: 8,450 feet <br /> Material weight: 2,900 lbs/LCY <br /> Weight description: Sand and gravel-Dry <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.750 (AVG.) <br /> Material consistency: 1.000 (CAT HB) <br /> CIRCES Cost Estimating Software <br />