Laserfiche WebLink
Page 1 of 2 <br /> BULLDOZER WORK <br /> Task description: Replace 8"Topsoil- 14.98 Acres- 110c&Stage 1 <br /> Permit Action: Conversion <br /> Site: Williams/Illinois Gravel Pit Application Permit/Job#: M1997039 <br /> PROJECT IDENTIFICATION <br /> Task#: 002 State: __Colorado Abbreviation: __None _ <br /> Date: 8/27/2014 County: Jackson _ Filename: M039-002 <br /> User: PSH <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D8T-8SU <br /> Horsepower: 310 <br /> Blade Type: Semi-Universal <br /> Attachment: 3-shank ripper <br /> Shift Basis: l Eer day _ <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $69.05 NA <br /> Operating Cost/Hour: $108.22 100 <br /> Ripper op. Cost/Hour: _ $7.46 __ 100 <br /> Operator Cost/Hour: $38.01 NA <br /> Total unit Cost/Hour: $222.73 <br /> Total Fleet Cost/Hour: $222.73 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 15,950 <br /> Swell factor: 1.000 <br /> Loose volume: 15,950 LCY <br /> Source of estimated volume: Division of Reclamation,Mining&Safety <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Average push distance: 80 feet <br /> Unadjusted hourly production: 984.2 LCY/hr <br /> Materials consistency description: Consolidated stockpile 1.0 <br /> Average push gradient: -10% <br /> Average site altitude: 8,450 feet <br /> Material weight: 1,600 lbs/LCY <br /> Weight description: Top Soil <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.750 _ (AVG.) <br /> Material consistency: 1.000 (CAT HB) <br /> CIRCES Cost Estimating Software <br />