2014-10-15_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-10-15_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2020 9:10:32 PM
Creation date
10/16/2014 12:47:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
10/15/2014
Doc Name
Weekly CQA Report: Week ending 10/4/14.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec <br /> station 85+00 of the ADR haul road. The material was placed as structural fill on the former Ball <br /> Mill access road by a Cat dozer and compacted with a smooth drum roller. <br /> Two Cat dozers were cutting the slope at the Ball Mill crossing south of the ADR Haul Road a` <br /> station 87+00. The material was pushed down slope and spread as structural fill upslope of <br /> stations J12+00 to J14+00. The structural fill was placed per project specifications but still <br /> requires compaction. <br /> Processed undersized riprap material was transported between stations 20+00 and 25+00 on the <br /> ADR haul road. Some washed out low volume fill material was also hauled from the PSSA floor <br /> to the area. The material was placed as structural fill by a Cat dozer and compacted with a <br /> smooth drum roller. <br /> Stockpiled cut material from slope grading near ADR Haul Road station 15+00 was transported to <br /> Bench F near station F20+00 and placed as structural fill. <br /> Subgrade: <br /> No new subgrade was accepted during this reporting period. See the attached figure of accepted <br /> subgrade in the Phase 1 area. <br /> Soil Liner Fill: <br /> Excess soil liner fill was removed from Bench B. <br /> Soil liner fill (SLF)was spread by a Cat dozer in an approximate nominal 1.2 to 1.3 foot loose-lift <br /> above Bench B between stations B2+00 to B8+00. Portions of the SLF surface were compacted <br /> by a smooth drum roller per project specification. <br /> SLF Processing: <br /> Cameron Site: There was no SLF processing activity at the Cameron Site during this reporting <br /> period. <br /> Underdrain System: <br /> Primary Underdrain: Complete. <br /> Secondary Underdrain: No work was performed during this reporting period. <br /> Tertiary Underdrain: A Cat excavator and hammer hoe worked on trenching for tertiary <br /> underdrain above Bench B station B16+00 in the Phase 1 area. <br /> B) Underground Workings: <br /> Underground working UG#6588 was blasted. Additional remediation is required. <br /> Workings UG#6117, UG#6153, UG#6551, and UG#6579 were plugged with concrete. <br /> Concrete cylinders were cast for strength testing. Additional remediation is required. <br /> C) Geomembrane: <br /> PSSA <br /> Primary 100-mil DSMS LLDPE Liner Installation <br /> ECA installed 100-mil LLDPE smooth geomembrane in the PSSA. Panels P-373 through P-429 <br /> were deployed on accepted LVSCF. Twenty full rolls and multiple partial rolls of 100-mil LLDPE <br /> smooth geomembrane were deployed yielding 7,236 lineal feet of fusion welds for an <br /> approximate installed weekly total of 129,553 square feet. Quality control was performed using <br /> 2014 10 04-MLE2 WEEKLY FINAL Page 2 of 8 <br />