My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-10-07_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-10-07_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2020 10:25:02 AM
Creation date
10/8/2014 8:26:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
10/7/2014
Doc Name
Weekly CQA Report: Week ending 09/20/14.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br /> Working UG#6117 was partially excavated, prepared for confirmatory drilling, and drilled. <br /> C) Geomembrane: <br /> PSSA <br /> Primary 100-mil DSMS LLDPE Liner Installation <br /> ECA installed 100-mil LLDPE smooth geomembrane in the PSSA. Panels P-214 through P-313 <br /> were deployed on approved LVSCF. Fifty one (51)full rolls and multiple partial rolls of 100-mil <br /> LLDPE smooth geomembrane were deployed yielding 21,784 lineal feet of fusion welds for an <br /> approximate installed weekly total of 322,860 square feet. A wrinkle was removed from panels <br /> P-11 to P-17 by cutting out excess material and fusion welding the liner back together. Quality <br /> control was performed using two extrusion guns. All seams were fusion welded per project <br /> technical specifications. All work performed was observed by AMEC QA personnel. <br /> Approximately 460 lineal feet of anchor trench was backfillec over primary liner and compacted <br /> per project specifications. <br /> Destructive samples PDF-81 through PDF-121 and PDX-3 were marked for testing. PDF-34; <br /> PDF-79 through PDF-102; PDF-104 through PDF-107; PDF-109 through PDF-115 and PDX-3 <br /> were tested and passed per project technical specifications. PDF-103 failed; the seam was <br /> delineated with passing results and capped. <br /> D) Low Volume Solution Collection Fill (LVSCF): <br /> PSSA <br /> Cat 740 trucks hauled LVSCF to the PSSA. Haul roads for the trucks were maintained at least 4 <br /> feet above secondary geomembrane. <br /> Ames continued placing LVSCF on approved secondary liner in minimum 3-foot lifts with Cat <br /> GPS D6 and D8 wide pad dozers between panels. S248 to S254; S268; S270 to S273; S275; <br /> S284 to S287; S294 to S299; S321 to S324; S354; S355; S359; S361 to S363; S365; S366, and <br /> S368; S380 to S382; and S390 to S392. <br /> See the attached LVSCF map for all placement locations. <br /> E) Drain Cover Fill (DCF): <br /> Cat 740 trucks hauled drain cover fill (DCF)to the PSSA. Haul roads for the Cat 740s were <br /> maintained at least 4 feet above the secondary geomembrane. <br /> Drain cover fill was placed on approved primary liner in minimum 2-foot lifts in the PSSA on <br /> panels P1 to P3; P8 to P10; P17 to P20; P159 to P213; and P218 to P225. HVSCS piping was <br /> also laid out on the ADR ramp per the design drawings. <br /> II) Storm Water Management <br /> Best Management Practices (BMPs) are being performed. <br /> COA ACTIVITIES: <br /> I) Field Activities: Field activities and observation during this reporting period included: Slope grading <br /> and fill placement; underground working remediation and confirmatory drilling; geomembrane <br /> deployment, testing, repair monitoring, and certification; LVSCF acceptance for primary liner <br /> deployment; and LVSCF and DCF sampling. <br /> 2014 09 20-MLE2 WEEKLY FINAL Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.