Laserfiche WebLink
arneO <br /> II) Laboratory Activities: Permeability,Atterberg limits, moisture, and sieve analysis laboratory testing <br /> continued. <br /> The following samples were collected and returned to AMEC's laboratory for analysis: <br /> Drain Cover Fill samples DCF 107 through DCF 109(control samples) <br /> ➢ Drain Cover Fill sample DCF 1-R(Record sample.) <br /> ➢ Low Volume Solution Collection Fill samples LVSCF 17A-R and 17B-R(Record samples) <br /> General Proiect Items <br /> Meetings and Discussions: <br /> Weekly Contractor Meeting September 17, 2014(CC&V,AMEC, Ames) <br /> ➢ Weekly CC&V Safety Meeting September 18, 2014 <br /> ➢ ECA daily safety meetings <br /> ➢ Ames daily safety meetings <br /> Summary of Concerns: None. <br /> CC&V: Daily updates, reporting, and scheduling are some of the tasks occurring between CC&V <br /> Projects,AMEC, and Ames. <br /> Miscellaneous: <br /> ➢ Ames crusher operations re-continued drain cover fill production. <br /> Deliveries: <br /> ➢ 104 rolls of UX1800 Geogrid was delivered to Ames. AMEC is waiting instruction prior to <br /> conformance sampling. <br /> Submitted by: Eric Lorenson Date: September 23, 2014 <br /> Reviewed by: Date: September 23, 2014 <br /> Tim Burkhard <br /> Project Resident <br /> Phone: 719-689-2986 <br /> CC&V Projects <br /> Reviewed By: Date:L— I L— L— <br /> _/3/�yG <br /> Reviewed By: �is lL1C Date: <br /> 2014 09 204ALE2 WEEKLY FINAL Page 4 of 7 <br />