My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-10-07_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-10-07_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2020 10:25:02 AM
Creation date
10/8/2014 8:26:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
10/7/2014
Doc Name
Weekly CQA Report: Week ending 09/20/14.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br /> Subgrade: <br /> Two dozers continued slope grading the subgrade downslope of Bench DID between stations <br /> DD1+00 to DD5+00 in the Phase 1 area while a Cat hammer hoe broke oversized rock in the <br /> subgrade surface. The finished subgrade in this area was compacted with a smooth drum roller. <br /> The subgrade was certified for SLF placement from Bench B to 10 feet upslope of to Bench B <br /> between approximate stations BO+00 to 88+00. <br /> See the attached figure of approved subgrade in Phase 1. <br /> Soil Liner Fill: <br /> Cat 777 haul trucks transported SLF from the Cameron stockpile to a location below Bench F <br /> between stations FO+00 to F10+00 in the Phase 1 area on approved subgrade where it was <br /> stockpiled for future use. <br /> Soil liner fill (SLF)was transported from the Phase 1 stockpile located below Bench F between <br /> stations FO+00 to F10+00 and was placed along Bench DID from stations DD4+00 to DD10+00 <br /> and upslope between stations B2+00 to B8+00. Some of the SLF was used to form a temporary <br /> road to Bench B from Bench DD, <br /> Low Volume Solution Collection Fill: <br /> The following low volume solution collection fill (LVSCF) areas in the PSSA were placed to <br /> finished grade per project specifications, inspected, and approved for primary geomembrane <br /> placement: <br /> From the ADR road to central PSSA floor and western slopes. <br /> See the attached LVSCF map for all placement and accepted locations for primary geomembrane <br /> deployment. <br /> SLF Processing: <br /> Cameron Site: No SLF mining or processing occurred at the Cameron Site. However, Ames <br /> continued transporting the Cameron stockpiled SLF to a new stockpile located below Bench F <br /> between stations FO+00 to F10+00 in the Phase 1 area. The processing equipment remains at <br /> the Cameron site. <br /> Underdrain System: <br /> Primary Underdrain: Complete. <br /> Secondary Underdrain: No work was performed during this reporting period. <br /> Tertiary Underdrain: Complete within the PSSA footprint. <br /> B) Underground Workings: <br /> Confirmatory drilling occurred at underground working and UG#6313. Additional remediation is <br /> required. <br /> Working UG#6576 was drilled, blasted, and requires further remediation. <br /> Working UG#6200 and were excavated to competent rock, backfilled per project specifications, <br /> and is considered remediated. <br /> Shot rock was excavated from working UG#6639 and it was partially backfilled for safety. <br /> Further remediation is required. <br /> 2014 09 20-MLE2 WEEKLY FINAL Page 2 of 7 <br />