My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-10-07_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-10-07_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2020 10:25:02 AM
Creation date
10/8/2014 8:26:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
10/7/2014
Doc Name
Weekly CQA Report: Week ending 09/20/14.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br /> CRIPPLE CREEK &VICTOR GOLD MINING Co. <br /> ANGLOGOLD ASHANTI (COLORADO) <br /> SQUAW GULCH (VLF) & HWY 67 RE-ALIGNMENT MONITORING WEEKLY REPORT <br /> Owner: Cripple Creek&Victor Gold Mining Co. Project Number: 74201125NO <br /> Project: Squaw Gulch Valley Leach Fill (VLF) Week Ending: September 20, 201,`. <br /> Location: Cripple Creek&Victor Gold Mine, CO <br /> Contractor: Ames Construction, Inc. <br /> Reporting Period: 09.14.2014 through 09.20.2014 <br /> Days S M T W T F S <br /> D D D D D D D <br /> Work Shifts <br /> - j N N N N N N <br /> D=Day Shift N=Night Shift H= Holiday <br /> Ambient Temperature Ranges During Week Weather Conditions During Week: <br /> Highs: 64°F to 70°F Cloud Cover: Partly cloudy to overcast <br /> Lows: 37°F to 43°F <br /> Precipitation: Rain:Tue., Wed., Sat. <br /> Wind: Variable <br /> Ames: Continuing construction tasks for the Valley Leach Facility(VLF). <br /> Planning: Continuing construction activities and scheduling for the VLF. <br /> CONSTRUCTION ACTIVITIES AND PROGRESS: <br /> 1) Earthworks <br /> A) VLF(PSSA, Phase 1, and'2) <br /> Topsoil/Overburden Stripping: None. <br /> Tree Grubbing and Clearing, Chipping: None. <br /> Production Drilling: No production drilling occurred in the VLF. <br /> Production Blasting: No production blasting occurred within the VLF. <br /> Structural Fill: <br /> All structural fill material discussed below was placed and compacted per the project technical <br /> specifications unless otherwise stated. <br /> Excess material was cut from near station 15+00 on the ADR haul road turn around. The <br /> material was transported downslope of Bench C stations C14+00 to C18+00 and to Bench F <br /> stations F15+00 to F17+00 where it was placed as structural fill and compacted. <br /> Non-woven geofabric and riprap were placed in the Phase 2 Diversion channel from approximate <br /> stations 8+00 to 10+00. <br /> 2014 09 20-MLE2 WEEKLY FINAL Page 1 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.