Laserfiche WebLink
363 <br />364 <br />365 <br />369 <br />41A <br />45A <br />45B <br />45C <br />45D <br />45E <br />Regrade GVB -B 17F and -B 19C pads and roads <br />DOZER <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />35.30 <br />$8,957.00 <br />$3,802.00 <br />$4,731.00 <br />$4,373.93 <br />$23,401.60 <br />$128,585.00 <br />$9,081.00 <br />$41,542.00 <br />$7,541.00 <br />$44,583.00 <br />Re- topsoil GVB -B 17F and -B 19C pads and roads <br />DOZER <br />14.99 <br />Reseed road and pads for GVBs, exploration, and <br />wells <br />REVEGE <br />17.00 <br />Seal Well DH -67blw <br />BOREHOLE <br />0.00 <br />Nuclear Density Testing of Refuse <br />NA <br />320.00 <br />Distribute Gob Pile #2 cover hauled by T/L <br />DOZER <br />375.26 <br />Haul Cover Material from Borrow Area #1 to Gob <br />Pile #2 <br />TRUCKI <br />50.03 <br />Haul Cover Material from Borrow Area #2 to Gob <br />Pile #2 <br />TRUCKI <br />228.88 <br />Haul Cover Material from Borrow Area #3 to Gob <br />Pile #2 <br />TRUCKI <br />41.55 <br />Haul Cover Material from B Portal Storage to Gob <br />Pile #2 <br />TRUCKI <br />108.83 <br />SUBTOTALS: <br />16137.97 <br />$10,135,737 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />2.02% <br />Total = <br />$204,741.89 <br />Performance bond: <br />1.05% <br />Total = <br />$106,42524 <br />Job superintendent: <br />2,100.00 hrs <br />Total = <br />$157,836.00 <br />Profit: <br />10.00% <br />Total = <br />$1,013,573.70 <br />TOTAL O & P = <br />$1,482,576.83 <br />CONTRACT AMOUNT (direct + O & P) = <br />$11,618,313.83 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal /related costs): <br />Engineering work and/or contract/bid preparation: <br />Reclamation management and /or administration: <br />0.00 <br />4.00% <br />3.13% <br />14161011I►IN0 014V�1111I <br />Total = 0.00 <br />Total = $464,732.55 <br />$363,65322 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $2,310,962.61 <br />TOTAL BOND AMOUNT (direct + indirect) = $12,446,699.61 <br />