My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-10-06_GENERAL DOCUMENTS - C1996083
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1996083
>
2014-10-06_GENERAL DOCUMENTS - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:48:31 PM
Creation date
10/6/2014 1:51:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
General Documents
Doc Date
10/6/2014
Doc Name
Midterm Review Midterm/Cost Estimate (MT4)
From
DRMS
Permit Index Doc Type
Findings
Email Name
SLB
DIH
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRUCK/LOADER TEAM WORK <br />Task description: Pull back and Haul Portal Bench Fill Material to Cut Slope <br />Site: Bowie No. 2 Mine Permit Action: Midterm Review 4 Permit/Job #: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: 001 State: Colorado <br />Date: 10/3/2014 County: Delta <br />User: SLB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />ipti <br />Truck Loader Team - Truck: Cat 773F <br />- Loader: Cat 365C L 13' -7" Stick <br />Abbreviation: None <br />Filename: C083 -001 <br />Shift basis: 1 per day <br />Support Equipment -Load Area: <br />-Dump Area: <br />NA <br />NA <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />NA <br />NA <br />Cost Breakdown: Truck /Loader Team Sunnort Eauinment Maintenance Eauinment <br />Total work team cost/hour: $683.17 <br />MATERIAL QUANTITIES <br />Initial volume: 260,953 CCY Swell factor: 1.165 <br />Loose volume: 304,010 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck <br />Excavator <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$65.23 <br />$75.46 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$124.51 <br />$144.45 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$27.80 <br />$28.17 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$217.54 <br />$248.09 <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />1 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: $683.17 <br />Support: $0.00 <br />Maint: $0.00 <br />Total work team cost/hour: $683.17 <br />MATERIAL QUANTITIES <br />Initial volume: 260,953 CCY Swell factor: 1.165 <br />Loose volume: 304,010 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: <br />2,900 <br />Pounds /LCY <br />Description: <br />Decomposed rock - <br />50% Rock, 50% Earth <br />Rated Payload: <br />122,520 <br />Pounds <br />Payload Capacity: <br />42.25 <br />LCY <br />Truck Bed (volume) Basis: <br />Struck Volume: <br />35.00 LCY <br />Heaped Volume: <br />46.50 LCY <br />
The URL can be used to link to this page
Your browser does not support the video tag.