242
<br />252
<br />253
<br />254
<br />255
<br />256
<br />257
<br />261
<br />271
<br />276
<br />277
<br />278
<br />279
<br />280
<br />281
<br />282
<br />283
<br />284
<br />285
<br />286
<br />287
<br />288
<br />289
<br />290
<br />291
<br />296
<br />299
<br />300
<br />301
<br />302
<br />331
<br />335
<br />337
<br />338
<br />339
<br />340
<br />341
<br />343
<br />344
<br />345
<br />346
<br />352
<br />353
<br />358
<br />359
<br />360
<br />361
<br />362
<br />Replace Topsoil from Stockpile to Terror Creek Lt-
<br />Use Road
<br />DOZER
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />22.45
<br />$5,696.00
<br />$1,398.00
<br />$5,949.00
<br />$409.00
<br />$2,697.00
<br />$1,286.00
<br />$4,838.00
<br />$161,689.34
<br />$33,544.06
<br />$7,667.00
<br />$5,218.00
<br />$9,050.00
<br />$87,776.78
<br />$32,426.00
<br />$24,618.00
<br />$25,746.00
<br />$19,546.00
<br />$11,920.00
<br />$1,649.00
<br />$924.00
<br />$660.00
<br />$271.00
<br />$1,280.00
<br />$404.00
<br />$10,615.86
<br />$2,922.00
<br />$6,964.13
<br />$14,851.49
<br />$543.00
<br />$1,029.00
<br />$2,674.00
<br />$1,513.00
<br />$1,391.00
<br />$5,635.73
<br />$1,767.00
<br />$3,396.00
<br />$1,442.00
<br />$78,562.40
<br />$9,624.00
<br />$38,877.00
<br />$20,231.00
<br />$2,690.00
<br />$2,783.00
<br />$119,908.35
<br />$44,920.00
<br />$13,551.00
<br />$23,375.00
<br />$19,620.22
<br />Regrade BRL- 1- 03 -01, 1- 08 -01, and 1 -08 -04 pads
<br />DOZER
<br />5.51
<br />Regrade Light -Use Roads BRL- 1- 03 -01, - 08 -01, and -
<br />08 -04
<br />DOZER
<br />23.45
<br />Replace topsoil on BRL- 1- 03 -01, - 08 -01, and -08 -04
<br />pads
<br />DOZER
<br />1.61
<br />Replace topsoil on LU Roads to BRL- 1- 03 -01, - 08 -01,
<br />& -08 -04
<br />DOZER
<br />10.63
<br />Reseed BRL- 1- 03 -01, - 08 -01, and -08 -04 pads
<br />REVEGE
<br />4.00
<br />Reseed BRL- 1- 03 -01, - 08 -01, and -08 -04 LU roads
<br />REVEGE
<br />16.00
<br />Plug and Backfill Vent Shaft
<br />NA
<br />80.00
<br />Plug and Seal Six Gob Vent Boreholes
<br />BOREHOLE
<br />72.00
<br />Reseed Six Drill Pads
<br />REVEGE
<br />11.02
<br />Reseed Light -Use Roads
<br />REVEGE
<br />7.50
<br />Access Road Topsoil (9.08 acres - TR73)
<br />DOZER
<br />43.32
<br />Plug and seal 13 boreholes TR -73
<br />BOREHOLE
<br />156.00
<br />Reseed Drill Pads (13 pads - TR -73)
<br />REVEGE
<br />23.92
<br />Reseed Access Roads - TR -73
<br />REVEGE
<br />18.16
<br />Drill Pad backfill (13 pads TR -73)
<br />DOZER
<br />123.24
<br />Access Road Regrading (9.08 acres - TR73)
<br />DOZER
<br />93.57
<br />Drill Pad Topsoil (13 pads - TR73)
<br />DOZER
<br />57.06
<br />Regrade GVB -B 13F Drill Pad
<br />DOZER
<br />6.50
<br />Regrade Light -Use Road to GVB -B 13F
<br />DOZER
<br />3.64
<br />Replace Topsoil from Stockpile to GVB -B 13F pad
<br />DOZER
<br />2.60
<br />Replace Topsoil from Stockpile to GVB -B 13F Light-
<br />Use Road
<br />DOZER
<br />1.07
<br />Reseed GVB -B 13F Drill Pad
<br />REVEGE
<br />2.00
<br />Reseed Light -Use Road to GVB -B 13F
<br />REVEGE
<br />2.00
<br />Plug and Seal Two Gob Vent Boreholes
<br />BOREHOLE
<br />48.00
<br />Reseed Two Drill Pads
<br />REVEGE
<br />4.00
<br />Plug and Seal GVB -B 13F
<br />BOREHOLE
<br />48.00
<br />Plug and Seal 4 Utility Holes at Fan Bench
<br />BOREHOLE
<br />48.00
<br />Reseed Add'1 Disturbance from Utility Boreholes at
<br />Fan Bench
<br />REVEGE
<br />1.00
<br />Regrade Fan Bench - Utility Borehole Mudpit Add'1
<br />Dist.
<br />DOZER
<br />4.06
<br />Regrade Vent Hole B 13 Drill Pad
<br />DOZER
<br />10.54
<br />Re- topsoil Vent Hole B13 Drill Pad
<br />DOZER
<br />5.96
<br />Reseed Bleeder Vent Boreholes B13
<br />REVEGE
<br />020
<br />Plug and Seal GVB B13C -1
<br />BOREHOLE
<br />48.00
<br />Reseed road and pad for GVB B13C -1
<br />REVEGE
<br />2.00
<br />Regrade GVB B 13C -1 pad and road
<br />DOZER
<br />13.39
<br />Re-topsoil GVB B13C -1
<br />DOZER
<br />5.68
<br />Increase Depth of GVB -B 15A
<br />BOREHOLE
<br />0.00
<br />Re- topsoil 6 GVBs, 1 Exploration hole, 2 Monitoring
<br />Well pad
<br />DOZER
<br />37.93
<br />Regrade GVB, exploration and well pads and roads
<br />DOZER
<br />153.22
<br />Reseed road and pads for GVBs, exploration, and
<br />wells
<br />REVEGE
<br />15.00
<br />Re- topsoil Pitkin Mesa Pipeline corridor
<br />DOZER
<br />10.60
<br />Reseed Pitkin Mesa Pipeline Corridor
<br />REVEGE
<br />15.00
<br />Seal 10 GVB and 3 Exploration Holes
<br />BOREHOLE
<br />0.00
<br />Regrade GVB /exploration hole pads and roads
<br />DOZER
<br />177.04
<br />Re- topsoil 10 GVB, 3 Exploration holes pads
<br />DOZER
<br />53.41
<br />Reseed road and pads for GVBs, exploration, and
<br />wells
<br />REVEGE
<br />17.00
<br />Seal GVB -B17F and B -19C
<br />I BOREHOLE
<br />24.00
<br />
|