Laserfiche WebLink
111 <br />112 <br />113 <br />114 <br />115 <br />116 <br />117 <br />118 <br />119 <br />120 <br />121 <br />122 <br />123 <br />124 <br />125 <br />126 <br />127 <br />128 <br />129 <br />130 <br />131 <br />140 <br />141 <br />142 <br />150 <br />151 <br />152 <br />154 <br />155 <br />156 <br />157 <br />165 <br />170 <br />171 <br />172 <br />173 <br />174 <br />180 <br />181 <br />182 <br />183 <br />241 <br />Bench <br />1 <br />1 <br />1 <br />4 <br />1 <br />1 <br />1 <br />1 <br />4 <br />4 <br />1 <br />4 <br />1 <br />1 <br />1 <br />4 <br />1 <br />1 <br />4 <br />1 <br />4 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />$26,854.00 <br />$23,487.00 <br />$51,498.00 <br />$1,362.00 <br />$7,706.00 <br />$1,445.00 <br />$1,676.00 <br />$1,126.00 <br />$39,968.00 <br />$51,357.00 <br />$13,166.00 <br />$268.00 <br />$46,221.00 <br />$4,119.00 <br />$44,604.00 <br />$245.00 <br />$1,005.00 <br />$2,945.00 <br />$7,953.00 <br />$159.00 <br />$1,080.00 <br />$183,294.01 <br />$109,521.12 <br />$778,875.64 <br />$594,939.00 <br />$52,275.00 <br />$60,053.00 <br />$131,844.00 <br />$1,670.00 <br />$278.00 <br />$51,529.00 <br />$1,800,431.63 <br />$689.85 <br />$131,54039 <br />$138,227.00 <br />$238,012.40 <br />$103,205.76 <br />$46,787.00 <br />$46,787.00 <br />$4,574.00 <br />$29,916.00 <br />$7,544.00 <br />Replace Topsoil from Stockpile A to Truck <br />Loadout/Coal Stkpl <br />SCRAPERI <br />45.71 <br />Replace Topsoil from Stockpile F to Train Loadout <br />SCRAPERI <br />39.98 <br />Replace Topsoil from Stockpile A to B -Seam Portal <br />Bench <br />SCRAPERI <br />87.66 <br />Replace Topsoil fm Stockpile to Freeman Gulch Vent <br />Shaft Pad <br />DOZER <br />0.93 <br />Replace Topsoil fm Stockpiles C/D to Pond C and <br />Gob Pond D <br />SCRAPERI <br />13.12 <br />Replace topsoil from Stockpile to Pond F <br />DOZER <br />3.95 <br />Replace topsoil from Stockpile F to Pond J <br />SCRAPERI <br />2.85 <br />Replace topsoil from Stockpile F to Pond K <br />SCRAPERI <br />1.92 <br />Replace topsoil fm stockpile to MR/TR Light -Use <br />Roads <br />DOZER <br />27.35 <br />Replace topsoil from stockpiles to MR/TR drill pads <br />DOZER <br />36.23 <br />Replace topsoil from Stockpile A to Prep Plant Bench <br />SCRAPERI <br />22.41 <br />Replace topsoil from stockpile to Material Storage <br />Area <br />DOZER <br />0.18 <br />Replace topsoil from Stockpile E to Gob Pile #2 <br />SCRAPERI <br />78.68 <br />Replace Topsoil from Stockpile D to Gob Pile #4 <br />SCRAPERI <br />7.01 <br />Replace topsoil from stockpile to Gob Pile #3 <br />SCRAPERI <br />75.92 <br />Replace topsoil from stockpile to Haul Road <br />DOZER <br />0.17 <br />Replace topsoil from stockpile to Water Tank Bench <br />SCRAPERI <br />1.71 <br />Replace topsoil from Stockpile G to TR35 road/pad <br />SCRAPERI <br />5.01 <br />Replace topsoil from stockpile to Borrow Area <br />DOZER <br />5.44 <br />Replace topsoil fm stockpile to Upper Parking Lot <br />Expansion <br />DOZER <br />0.46 <br />Replace topsoil fm stockpile to Hubbard Ck Vent <br />Shaft Pad <br />DOZER <br />0.74 <br />Seal Portals and Shafts <br />MINESEAL <br />40.00 <br />Seal Vent Shaft <br />NA <br />80.00 <br />Plug /Seal Boreholes <br />BOREHOLE <br />1,502.00 <br />Drill Seed Mix 3 on Disturbed Area <br />REVEGE <br />40.00 <br />Drill Seed Drill Pads <br />REVEGE <br />60.00 <br />Drill Seed Lt -Use Roads to Drill Pads and Terror <br />Creek <br />REVEGE <br />65.00 <br />Broadcast Seed Mix 3 on Gob Pile #3 <br />REVEGE <br />0.00 <br />Drill seed Hubbard Creek Vent Shaft Pad <br />REVEGE <br />0.00 <br />Drill Seed Rock Laydown Area <br />REVEGE <br />0.00 <br />Weed Control Over 10 -Year Liability Period <br />REVEGE <br />0.00 <br />Demolish and Remove all Structures <br />DEMOLISH <br />80.00 <br />Proctor Testing of Backfill <br />NA <br />5.00 <br />Nuclear Density Testing of Backfill <br />NA <br />1,760.00 <br />Water Truck for Moisture Augmentation of Backfill <br />Material <br />MISCTRUK <br />1,437.02 <br />Site Maintenance - Ten Years <br />SITEMAINT <br />ENANCE <br />292.00 <br />Support Equipment for Scraper Hauling <br />SITEMAINT <br />ENANCE <br />449.16 <br />Mobilize /Demobilize Equipment for First <br />Construction Season <br />MOBILIZE <br />12.00 <br />Mobilize /Demobilize Equipment for Second <br />Construction Season <br />MOBILIZE <br />12.00 <br />Mobilize / Demoblize Equipment for Pond Removal <br />MOBILIZE <br />6.50 <br />Mobilize /Demobilize Equipment for Yearly Site <br />Maintenance <br />MOBILIZE <br />14.00 <br />Regrade Terror Creek Light -Use Road <br />DOZER <br />29.73 <br />