Laserfiche WebLink
Bowie No. 2 Mine (C- 1996 -083) <br />MT- 4 <br />281 <br />282 <br />283 <br />284 <br />285 <br />286 <br />287 <br />288 <br />289 <br />290 <br />291 <br />296 <br />299 <br />300 <br />301 <br />302 <br />331 <br />335 <br />337 <br />338 <br />339 <br />340 <br />341 <br />343 <br />344 <br />345 <br />346 <br />352 <br />353 <br />358 <br />359 <br />360 <br />361 <br />362 <br />363 <br />364 <br />365 <br />369 <br />41A <br />45A <br />45B <br />45C <br />Reseed Access Roads - TR -73 <br />REVEGE <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />18.16 <br />$24,618.00 <br />$25,746.00 <br />$19,546.00 <br />$11,920.00 <br />$1,649.00 <br />$924.00 <br />$660.00 <br />$271.00 <br />$1,280.00 <br />$404.00 <br />$10,615.86 <br />$2,922.00 <br />$6,964.13 <br />$14,851.49 <br />$543.00 <br />$1,029.00 <br />$2,674.00 <br />$1,513.00 <br />$1,391.00 <br />$5,635.73 <br />$1,767.00 <br />$3,396.00 <br />$1,442.00 <br />$78,562.40 <br />$9,624.00 <br />$38,877.00 <br />$20,231.00 <br />$2,690.00 <br />$2,783.00 <br />$119,908.35 <br />$44,920.00 <br />$13,551.00 <br />$23,375.00 <br />$19,620.22 <br />$8,957.00 <br />$3,802.00 <br />$4,731.00 <br />$4,373.93 <br />$23,401.60 <br />$128,585.00 <br />$9,081.00 <br />$41,542.00 <br />Drill Pad backfill (13 pads TR 73) <br />DOZER <br />123.24 <br />Access Road Regrading (9.08 acres - TR73) <br />DOZER <br />93.57 <br />Drill Pad Topsoil (13 pads - TR73) <br />DOZER <br />57.06 <br />Regrade GVB -B 13F Drill Pad <br />DOZER <br />6.50 <br />Regrade Light -Use Road to GVB -B 13F <br />DOZER <br />3.64 <br />Replace Topsoil from Stockpile to GVB -B 13F pad <br />DOZER <br />2.60 <br />Replace Topsoil from Stockpile to GVB -B 13F <br />Light -Use Road <br />DOZER <br />1.07 <br />Reseed GVB -B 13F Drill Pad <br />REVEGE <br />2.00 <br />Reseed Light -Use Road to GVB -B 13F <br />REVEGE <br />2.00 <br />Plug and Seal Two Gob Vent Boreholes <br />BOREHOLE <br />48.00 <br />Reseed Two Drill Pads <br />REVEGE <br />4.00 <br />Plug and Seal GVB -B 13F <br />BOREHOLE <br />48.00 <br />Plug and Seal 4 Utility Holes at Fan Bench <br />BOREHOLE <br />48.00 <br />Reseed Add'1 Disturbance from Utility Boreholes <br />at Fan Bench <br />REVEGE <br />1.00 <br />Regrade Fan Bench - Utility Borehole Mudpit <br />Add'1 Dist. <br />DOZER <br />4.06 <br />Regrade Vent Hole B 13 Drill Pad <br />DOZER <br />10.54 <br />Re- topsoil Vent Hole B13 Drill Pad <br />DOZER <br />5.96 <br />Reseed Bleeder Vent Boreholes B13 <br />REVEGE <br />0.20 <br />Plug and Seal GVB B13C -1 <br />BOREHOLE <br />48.00 <br />Reseed road and pad for GVB B13C -1 <br />REVEGE <br />2.00 <br />Regrade GVB B 13C -1 pad and road <br />DOZER <br />13.39 <br />Re- topsoil GVB B13C -1 <br />DOZER <br />5.68 <br />Increase Depth of GVB -B 15A <br />BOREHOLE <br />0.00 <br />Re- topsoil 6 GVBs, 1 Exploration hole, 2 <br />Monitoring Well pad <br />DOZER <br />37.93 <br />Regrade GVB, exploration and well pads and roads <br />DOZER <br />153.22 <br />Reseed road and pads for GVBs, exploration, and <br />wells <br />REVEGE <br />15.00 <br />Re-topsoil Pitkin Mesa Pipeline corridor <br />DOZER <br />10.60 <br />Reseed Pitkin Mesa Pipeline Corridor <br />REVEGE <br />15.00 <br />Seal 10 GVB and 3 Exploration Holes <br />BOREHOLE <br />0.00 <br />Regrade GVB /exploration hole pads and roads <br />DOZER <br />177.04 <br />Re- topsoil 10 GVB, 3 Exploration holes pads <br />DOZER <br />53.41 <br />Reseed road and pads for GVBs, exploration, and <br />wells <br />REVEGE <br />17.00 <br />Seal GVB -B17F and B -19C <br />BOREHOLE <br />24.00 <br />Regrade GVB -B 17F and -B 19C pads and roads <br />DOZER <br />35.30 <br />Re- topsoil GVB -B 17F arid-1319C pads and roads <br />DOZER <br />14.99 <br />Reseed road and pads for GVBs, exploration, and <br />wells <br />REVEGE <br />17.00 <br />Seal Well DH -67blw <br />BOREHOLE <br />0.00 <br />Nuclear Density Testing of Refuse <br />NA <br />320.00 <br />Distribute Gob Pile #2 cover hauled by T/L <br />DOZER <br />375.26 <br />Haul Cover Material from Borrow Area #1 to Gob <br />Pile #2 <br />TRUCKI <br />50.03 <br />Haul Cover Material from Borrow Area #2 to Gob <br />Pile #2 <br />TRUCKI <br />228.88 <br />Page 21 of 22 <br />