Laserfiche WebLink
Bowie No. 2 Mine (C- 1996 -083) <br />MT- 4 <br />45D <br />45E <br />Haul Cover Material from Borrow Area #3 to Gob <br />Pile #2 <br />TRUCKI <br />1 <br />1 <br />41.55 <br />$7,541.00 <br />$44,583.00 <br />Haul Cover Material from B Portal Storage to Gob <br />TRUCKI <br />108.83 <br />Pile #2 <br />$157,836.00 <br />Profit: 10.00% <br />Total = <br />$1,013,573.70 <br />SUBTOTALS: <br />16137.97 <br />$10,135,737 <br />INDIRECT COSTS <br />1LV /a:i:ID ININN010lW:Z61IyNI <br />Liability insurance: 2.02% <br />Total = <br />$204,741.89 <br />Performance bond: 1.05% <br />Total = <br />$106,42524 <br />Job superintendent: 2,100.00 hrs <br />Total = <br />$157,836.00 <br />Profit: 10.00% <br />Total = <br />$1,013,573.70 <br />TOTAL O & P = <br />$1,482,576.83 <br />CONTRACT <br />AMOUNT (direct + O & P) = <br />$11,618,313.83 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal /related costs): <br />0.00 <br />Total = <br />0.00 <br />Engineering work and/or contract/bid preparation: <br />4.00% <br />Total = <br />$464,732.55 <br />Reclamation management and /or administration: <br />3.13% <br />$363,65322 <br />CONTINGENCY: <br />0.00 <br />Total = <br />$0.00 <br />TOTAL INDIRECT COST = $2,310,962.61 <br />TOTAL BOND AMOUNT (direct + indirect) = $12,446,699.61 <br />Page 22 of 22 <br />