Bowie No. 2 Mine (C- 1996 -083)
<br />MT- 4
<br />130
<br />131
<br />140
<br />141
<br />142
<br />150
<br />151
<br />152
<br />154
<br />155
<br />156
<br />157
<br />165
<br />170
<br />171
<br />172
<br />173
<br />174
<br />180
<br />181
<br />182
<br />183
<br />241
<br />242
<br />252
<br />253
<br />254
<br />255
<br />256
<br />257
<br />261
<br />271
<br />276
<br />277
<br />278
<br />279
<br />280
<br />Replace topsoil fm stockpile to Upper Parking Lot
<br />Expansion
<br />DOZER
<br />1
<br />4
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />0.46
<br />$159.00
<br />$1,080.00
<br />$183,294.01
<br />$109,521.12
<br />$778,875.64
<br />$594,939.00
<br />$52,275.00
<br />$60,053.00
<br />$131,844.00
<br />$1,670.00
<br />$278.00
<br />$51,529.00
<br />$1,800,431.63
<br />$689.85
<br />$131,54039
<br />$138,227.00
<br />$238,012.40
<br />$103,205.76
<br />$46,787.00
<br />$46,787.00
<br />$4,574.00
<br />$29,916.00
<br />$7,544.00
<br />$5,696.00
<br />$1,398.00
<br />$5,949.00
<br />$409.00
<br />$2,697.00
<br />$1,286.00
<br />$4,838.00
<br />$161,68934
<br />$33,544.06
<br />$7,667.00
<br />$5,218.00
<br />$9,050.00
<br />$87,776.78
<br />$32,426.00
<br />Replace topsoil fm stockpile to Hubbard Ck Vent
<br />Shaft Pad
<br />DOZER
<br />0.74
<br />Seal Portals and Shafts
<br />MINESEAL
<br />40.00
<br />Seal Vent Shaft
<br />NA
<br />80.00
<br />Plug /Seal Boreholes
<br />BOREHOLE
<br />1,502.00
<br />Drill Seed Mix 3 on Disturbed Area
<br />REVEGE
<br />40.00
<br />Drill Seed Drill Pads
<br />REVEGE
<br />60.00
<br />Drill Seed Lt -Use Roads to Drill Pads and Terror
<br />Creek
<br />REVEGE
<br />65.00
<br />Broadcast Seed Mix 3 on Gob Pile #3
<br />REVEGE
<br />0.00
<br />Drill seed Hubbard Creek Vent Shaft Pad
<br />REVEGE
<br />0.00
<br />Drill Seed Rock Laydown Area
<br />REVEGE
<br />0.00
<br />Weed Control Over 10 -Year Liability Period
<br />REVEGE
<br />0.00
<br />Demolish and Remove all Structures
<br />DEMOLISH
<br />80.00
<br />Proctor Testing of Backfill
<br />NA
<br />5.00
<br />Nuclear Density Testing of Backfill
<br />NA
<br />1,760.00
<br />Water Truck for Moisture Augmentation of
<br />Backfill Material
<br />MISCTRUK
<br />1,437.02
<br />Site Maintenance - Ten Years
<br />SITEMAINT
<br />ENANCE
<br />292.00
<br />Support Equipment for Scraper Hauling
<br />SITEMAINT
<br />ENANCE
<br />449.16
<br />Mobilize /Demobilize Equipment for First
<br />Construction Season
<br />MOBILIZE
<br />12.00
<br />Mobilize /Demobilize Equipment for Second
<br />Construction Season
<br />MOBILIZE
<br />12.00
<br />Mobilize /Demobilize Equipment for Pond
<br />Removal
<br />MOBILIZE
<br />6.50
<br />Mobilize /Demobilize Equipment for Yearly Site
<br />Maintenance
<br />MOBILIZE
<br />14.00
<br />Regrade Terror Creek Light -Use Road
<br />DOZER
<br />29.73
<br />Replace Topsoil from Stockpile to Terror Creek
<br />Lt -Use Road
<br />DOZER
<br />22.45
<br />Regrade BRL- 1- 03 -01, 1- 08 -01, and 1 -08 -04 pads
<br />DOZER
<br />5.51
<br />Regrade Light -Use Roads BRL- 1- 03 -01, - 08 -01,
<br />and -08 -04
<br />DOZER
<br />23.45
<br />Replace topsoil on BRL- 1- 03 -01, - 08 -01, and -08-
<br />04 pads
<br />DOZER
<br />1.61
<br />Replace topsoil on LU Roads to BRL- 1- 03 -01, -
<br />08 -01, & -08 -04
<br />DOZER
<br />10.63
<br />Reseed BRL- 1- 03 -01, - 08 -01, and -08 -04 pads
<br />REVEGE
<br />4.00
<br />Reseed BRL- 1- 03 -01, - 08 -01, and -08 -04 LU roads
<br />REVEGE
<br />16.00
<br />Plug and Backfill Vent Shaft
<br />NA
<br />80.00
<br />Plug and Seal Six Gob Vent Boreholes
<br />BOREHOLE
<br />72.00
<br />Reseed Six Drill Pads
<br />REVEGE
<br />11.02
<br />Reseed Light -Use Roads
<br />REVEGE
<br />7.50
<br />Access Road Topsoil (9.08 acres - TR73)
<br />DOZER
<br />43.32
<br />Plug and seal 13 boreholes TR -73
<br />BOREHOLE
<br />156.00
<br />Reseed Drill Pads (13 pads - TR -73)
<br />REVEGE
<br />23.92
<br />Page 20 of 22
<br />
|