My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-10-06_GENERAL DOCUMENTS - C1996083
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1996083
>
2014-10-06_GENERAL DOCUMENTS - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:48:31 PM
Creation date
10/6/2014 1:51:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
General Documents
Doc Date
10/6/2014
Doc Name
Midterm Review Midterm/Cost Estimate (MT4)
From
DRMS
Permit Index Doc Type
Findings
Email Name
SLB
DIH
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 2 Mine (C- 1996 -083) <br />MT- 4 <br />081 <br />082 <br />083 <br />084 <br />085 <br />086 <br />090 <br />091 <br />092 <br />093 <br />095 <br />096 <br />097 <br />098 <br />099 <br />100 <br />101 <br />102 <br />106 <br />110 <br />111 <br />112 <br />113 <br />114 <br />115 <br />116 <br />117 <br />118 <br />119 <br />120 <br />121 <br />122 <br />123 <br />124 <br />125 <br />126 <br />127 <br />128 <br />129 <br />Regrade Access Road <br />DOZER <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />4 <br />1 <br />1 <br />1 <br />1 <br />4 <br />4 <br />1 <br />4 <br />1 <br />1 <br />1 <br />4 <br />1 <br />1 <br />4 <br />1.79 <br />$2,459.00 <br />$307.00 <br />$640.00 <br />$1,395.00 <br />$53,278.00 <br />$122,170.00 <br />$18,161.00 <br />$2,364.00 <br />$967.00 <br />$7,079.00 <br />$2,786.00 <br />$4,115.00 <br />$2,900.00 <br />$3,852.00 <br />$8,733.00 <br />$540.00 <br />$313.00 <br />$33,669.83 <br />$87,776.78 <br />$383,268.00 <br />$26,854.00 <br />$23,487.00 <br />$51,498.00 <br />$1,362.00 <br />$7,706.00 <br />$1,445.00 <br />$1,676.00 <br />$1,126.00 <br />$39,968.00 <br />$51,357.00 <br />$13,166.00 <br />$268.00 <br />$46,221.00 <br />$4,119.00 <br />$44,604.00 <br />$245.00 <br />$1,005.00 <br />$2,945.00 <br />$7,953.00 <br />Rip Freeman Gulch Vent Shaft Light -Use Road <br />RIPPER <br />0.20 <br />Backfill and Regrade Haul Road to Gob Pile 92 <br />DOZER <br />0.44 <br />Rip Lower Haul Road <br />RIPPER <br />0.95 <br />Regrade Lower Haul Road <br />DOZER <br />36.46 <br />Regrade Light Use Roads from MRs and TRs <br />DOZER <br />83.60 <br />Finish Grade Disturbed Mine Area <br />GRADER <br />129.92 <br />Finish Grade Train Loadout <br />GRADER <br />16.91 <br />Finish Grade B -Seam Portal Bench <br />GRADER <br />6.91 <br />Finish Grade Gob Piles #1, #2, #3, and #4 <br />GRADER <br />50.64 <br />Backfill and Regrade Pond B <br />DOZER <br />7.63 <br />Backfill and Regrade Pond C <br />DOZER <br />11.61 <br />Backfill and Regrade Gob Pile Pond D <br />DOZER <br />8.18 <br />Backfill and Regrade Pond F <br />DOZER <br />10.87 <br />Backfill and Regrade Pond J <br />DOZER <br />24.64 <br />Backfill and Regrade Pond K <br />DOZER <br />1.52 <br />Excavate for Post - mining Channel at B -Seam <br />Portals <br />EXCAVATE <br />0.63 <br />Postmining Channel Construction <br />NA <br />69.02 <br />Plug and seal <br />BOREHOLE <br />156.00 <br />Replace Topsoil from Stockpile A to Portal/Utility <br />Bench <br />SCRAPERI <br />652.39 <br />Replace Topsoil from Stockpile A to Truck <br />Loadout/Coal Stkpl <br />SCRAPERI <br />45.71 <br />Replace Topsoil from Stockpile F to Train Loadout <br />SCRAPERI <br />39.98 <br />Replace Topsoil from Stockpile A to B -Seam <br />Portal Bench <br />SCRAPERI <br />87.66 <br />Replace Topsoil fm Stockpile to Freeman Gulch <br />Vent Shaft Pad <br />DOZER <br />0.93 <br />Replace Topsoil fm Stockpiles C/D to Pond C and <br />Gob Pond D <br />SCRAPERI <br />13.12 <br />Replace topsoil from Stockpile to Pond F <br />DOZER <br />3.95 <br />Replace topsoil from Stockpile F to Pond J <br />SCRAPERI <br />2.85 <br />Replace topsoil from Stockpile F to Pond K <br />SCRAPERI <br />1.92 <br />Replace topsoil fm stockpile to MR/TR Light -Use <br />Roads <br />DOZER <br />27.35 <br />Replace topsoil from stockpiles to MR/TR drill <br />pads <br />DOZER <br />3623 <br />Replace topsoil from Stockpile A to Prep Plant <br />Bench <br />SCRAPERI <br />22.41 <br />Replace topsoil from stockpile to Material Storage <br />Area <br />DOZER <br />0.18 <br />Replace topsoil from Stockpile E to Gob Pile #2 <br />SCRAPERI <br />78.68 <br />Replace Topsoil from Stockpile D to Gob Pile #4 <br />SCRAPERI <br />7.01 <br />Replace topsoil from stockpile to Gob Pile #3 <br />SCRAPERI <br />75.92 <br />Replace topsoil from stockpile to Haul Road <br />DOZER <br />0.17 <br />Replace topsoil from stockpile to Water Tank <br />Bench <br />SCRAPERI <br />1.71 <br />Replace topsoil from Stockpile G to TR35 <br />road/pad <br />SCRAPERI <br />5.01 <br />Replace topsoil from stockpile to Borrow Area <br />DOZER <br />5.44 <br />Page 19 of 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.