Laserfiche WebLink
Bowie No. 2 Mine (C- 1996 -083) <br />MT- 4 <br />Number <br />Description <br />Originating <br />Status <br />Permit <br />Action <br />Material removed from the B Portal storage area may not be <br />mixed with or incorporated into the waste material. <br />31 <br />Prior to removal of topsoil along the Pitkin Mesa pipeline, all snow <br />MR -146 <br />CW <br />in the topsoil removal area shall be removed. Topsoil may not be <br />removed if ground conditions are wet or snowy. Photographic <br />documentation of conditions at topsoil removal shall be recorded <br />and submitted to the Division. <br />32 <br />Prior to excavation through Stevens Gulch Road, Bowie Resources, <br />MR -146 <br />CW <br />LLC must submit, to the Division, documentation of Delta County's <br />acknowledgement of the excavation activities within the roadway. <br />33 <br />Prior to any Pitkin Mesa Pipeline replacement disturbance, Bowie <br />MR -146 <br />CW <br />Resources, LLC (BRL) must determine which subsidence <br />monuments located over the replaced pipeline segment will be <br />disturbed. Any monuments that will be disturbed by the pipeline <br />replacement must be surveyed prior to removal, reset, and <br />surveyed again, with the reset positions calibrated relative to the <br />original locations. No undermining of the pipeline may occur until <br />the monuments are in place and surveyed. BRL must include the <br />survey data and a brief discussion of the relocated monument <br />positions in its next Semi - Annual Subsidence Report. <br />34 <br />Within 45 days of issuance of TR -77, BRL must submit a <br />TR -77 <br />FU <br />technical revision to address the following for proposed <br />Borrow Areas #1, #2, and #3 at Gob Pile #2: <br />a.A topsoil salvage, storage, and redistribution plan, in <br />accordance with Rules 2.05.3(5), 2.05.4(2)(d) and <br />4.06.4(2); <br />b.A regrading plan in accordance with Rules 4.14.1 and <br />4.14.2; <br />c.A revegetation plan in accordance with Rule 4.15; <br />d.A sediment control plan in accordance with Rules <br />2.05.3(4), 2.05.6(3), 4.05.1, and 4.05.2; <br />e.Revised map(s) in accordance with Rule 2.10.3, clearly <br />indicating the areas proposed for disturbance; <br />f. A reclamation plan and cost estimate in accordance with <br />Rule 2.05.4; and <br />g. A commitment from BRL that materials excavated from <br />any borrow area will be direct hauled for the purpose of <br />covering refuse material, and will not be incorporated <br />into the refuse material, such as for drying purposes. <br />The revision submittal due date was subsequently extended until <br />Page 10 of 22 <br />